Miscellaneous action | | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
Miscellaneous action | | | 2/14/2012 | | DONE |
|
|
|
Received as built drawings from the field inspector.
|
Miscellaneous action | | | 2/14/2012 | | DONE |
|
|
|
Received test certificate from the field inspector.
|
INSP-Final Inspection | 2/10/2012 | 2/10/2012 | 2/10/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/8/2012 | 2/9/2012 | 2/9/2012 | A | FAIL |
Troy Cobbley
|
|
|
Need verification of resubmittals and final paper work. Alarm testing is complete.
|
INSP-Sprinkler Rough-in/Hydro | 2/7/2012 | 2/8/2012 | 2/8/2012 | P | PASS |
Troy Cobbley
|
|
|
Hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 2/6/2012 | 2/7/2012 | 2/7/2012 | P | DEFR |
Forrest France
|
|
|
Richard is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 2/3/2012 | 2/6/2012 | 2/6/2012 | A | PART |
Troy Cobbley
|
|
|
Part of the rough-in passed but others failed. There are two area of concern where additional fittings have been added and as requested by the approval notes plans will need to be resubmitted. Upright sprinkler protection is overspaced above the slatted ceiling at the north end of the store. A hydro test is also required.
|
INSP-Sprinkler Rough-in | 1/26/2012 | 1/27/2012 | 1/27/2012 | A | FAIL |
Troy Cobbley
|
|
|
Could not perform the inspection due to the city approved plans being locked in the job shack. Also the area that was being requrested had been changed per the fitter. I deferred the changes to Tim Frost.
|
INSP-Sprinkler Rough-in | 1/24/2012 | 1/25/2012 | 1/25/2012 | A | CANC |
Troy Cobbley
|
|
|
To be canceled per Nate
|
INSP-Sprinkler Rough-in | 1/20/2012 | 1/23/2012 | 1/23/2012 | A | PASS |
Troy Cobbley
|
|
|
The piping above the hardlid areas is ok to cover.
|
INSP-Sprinkler Rough-in | 1/19/2012 | 1/20/2012 | 1/20/2012 | P | CANC |
Troy Cobbley
|
|
|
As late in the day as possible. Nate is the contact. Thanks Phone #: ###-#### Overbooked due to other inspections and Micron facilities plan review.
|
Issue and Print Permit | | | 1/5/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 12/19/2011 | | 1/4/2012 | | DONE |
Tim Frost
|
|
|
put in fee status by mistake
|
Plan resubmittals received | | | 1/4/2012 | | |
|
|
|
1-4-12 received 3 sets of plans sent to Tim Frost
|
Sprinkler Plan Check | 1/4/2012 | | 1/4/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 1/4/2012 | | 1/4/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 1/4/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 1/4/2012 | | DONE |
Barbara Stitt
|
|
|
Called and told permit is ready & fees due on 1-4-12 @ 3:00pm//BAS
|
Plan assigned to (Tim) | 12/16/2011 | | 12/19/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/19/2011 | | 12/19/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/19/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2011 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/19/2011 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 12/19/2011 | | DONE |
|
|
|
t/c w melody - permit denied - needs to be picked up and resubmitted
|
Application received | | | 12/16/2011 | | |
|
|
|
|