Miscellaneous action | | | 4/12/2012 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 3/29/2012 | 3/29/2012 | 3/29/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. EOL voltage drops are acceptable.
|
INSP-Alarm Testing | 3/27/2012 | 3/29/2012 | 3/29/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 3/27/2012 | 3/28/2012 | 3/27/2012 | A | CANC |
Troy Cobbley
|
|
|
We can meet at the loading dock on the west end of bldg6. Earlier in the morning the better. Thanks Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
|
Issue permit | | | 3/20/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Fees Due Hold | 3/15/2012 | | 3/20/2012 | | DONE |
|
|
|
|
INSP-Alarm Testing | 3/13/2012 | 3/14/2012 | 3/14/2012 | A | FAIL |
Troy Cobbley
|
|
|
A strobe in the basement stairwell is overspaced. It originally had a symbol designation for the candella rating and no one knew what it stood for. The contractor installed a 15cd in its place prior to this inspection. This 15cd strobe is overspace for corridor spacing and for room spacing. It was agreed that a 75cd strobe would work and will be installed. As builts do not match the installation and will need to be revised. Still need to witness the sync'ing of the audio/visual devices and verify EOL. I offered to perform both of these services but my offer was declined due to the 15cd strobe issue and an acceptable way to verify the EOL not being agreed upon yet. A re-inspection fee as been assigned.
|
Telephone call | | | 3/14/2012 | | DONE |
|
|
|
I spoke with Troy Cobbley to let him know that it was okay for Simplexgrinnell to remove the exterior horns because they are not required by code.
|
INSP-Alarm Testing | 3/6/2012 | 3/7/2012 | 3/7/2012 | P | DONE |
Troy Cobbley
|
|
|
See the city approved plans for locations where a strobe needs to be added at the north end of an exit corridor, candella needs to be increased in a room. New horns are shown to be added around the Service building but have not been installed. The horns need to be installed or be approved by Boise City plan review to remain deleted. Additional strobes have been added in a restroom and others have been relocated to nearby walls. These and all other changes need to be shown on as-built plans. Per Brian, the simplex tech., the same EOL issues as the last project are present. I deferred him to Deputy Chief Gervais. No testing of the audio/visual circuits was performed.
|
Issue and Print Permit | | | 2/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 2/3/2012 | | 2/10/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 2/10/2012 | | 2/10/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Resubmitted plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 2/10/2012 | | DONE |
|
|
|
Approved redlined resubmittals available at front counter.
|
Inspection Record Card- Fire | 2/10/2012 | | 2/10/2012 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/10/2012 | | DONE |
|
|
|
left vm for bob - permit ready and fees given
|
Permit Ready to Issue | | | 2/10/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 1/20/2012 | | 2/10/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan assigned to (Stephanie) | 1/24/2012 | | 2/10/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan resubmittals received | | | 2/3/2012 | | DONE |
Christina Prado
|
|
|
Received two copies of application, checklist, small docs and plans 1-11. Plans routed to Stephanie for review
|
1st review completed | | | 2/1/2012 | | FAIL |
|
|
|
|
Alarm Plan Check | 2/1/2012 | | 2/1/2012 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied - a new NAC panel is required because the new devices exceed the existing panel's capacity. Other redlines need to be incorporated in the resubmittal.
|
Telephone call | | | 2/1/2012 | | DONE |
|
|
|
Spoke with Dante to let him know that the plans would need to be resubmitted since they need to add a new NAC panel.
|
Miscellaneous action | | | 2/1/2012 | | DONE |
|
|
|
Faxed the review comments to the contractor.
|
Miscellaneous action | | | 2/1/2012 | | DONE |
|
|
|
Denied plans taken to front counter for contractor to pick up.
|
Miscellaneous action | | | 2/1/2012 | | DONE |
Tisha Gallop
|
|
|
Simplex picked up denied plans
|
Plan resubmittals received | | | 1/26/2012 | | DONE |
Tisha Gallop
|
|
|
received 2nd set of application, submittal docs, and plans; taken to Steph
|
Application received | | | 1/20/2012 | | |
|
|
|
|