Permit Information
Permit NumberFIR12-00023
StatusFinaled
Name ENTERPRISE ELECTRIC
Site Address 11311 W CHINDEN BLVD
Project NameHP BLDG 6 RENOVATION
Customer Number 
ePlanReviewNo
Description
This fire alarm permit is to replace existing speaker/strobes with horn/strobes and add new notification to accommodate a tenant remodel. Devices are to be tied in to existing NAC panels and circuits.

Associated building permit: BLD11-02773 (HEWLETT PACKARD)(BLDG 6 FAB - INTERIOR DEMOLITION & REPAIR) Select interior demolition work to change approximately 23,200 sq. ft. in the basement plus 28,200 sq. ft. on lower level and completely remove 1,024 sq. ft. of mechanical mezzanine, a total of 52,428 sq. ft. of existing 160,000 sq. ft., 2 level building (approx. 80,000 sq. ft. per level) back into vanilla shell and core space for future tenants per approved plans. Former use of the area of this scope of work was a fabrication facility. The work area is located on the south half of the building from the interior corridor south wall to the exterior south wall of the building and from the east side of the existing 2-hour area separation wall to the grid line S & S.5 on the plans. Work to include removal or modification of equipment, electrical, mechanical, plumbing, fire sprinkler and alarm systems; infill of openings in concrete created by removal of equipment; interior finish of damaged areas; restoration and maintenance of the fire-life in preparation for future tenant. NOTE: This building is fully fire sprinklered for allowable area increase. The existing 2-hour area separation wall along grid line C.5 up through the building created HP#6 East & HP#6 West, providing code compliance with allowable area for type of construction for the mixed use occupancy. All existing rated assemblies as indicated on plans are to be maintained. No additional interior work is allowed under this permit and no occupancy or use is being established. Separate plans, application, approval and permits are required for any future tenant improvements or occupancy of the indicated floor areas. Separate fire sprinkler plans and permits and alarm plans and permits are required as regulated by the Boise Fire Department. All fire and life safety systems (exiting, sprinklers, alarms, etc.) shall be maintained operational at all times during this scope of work unless specifically approved by the fire department. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  4/12/2012 DONE
Plans taken to records for scanning
INSP-Final Inspection3/29/20123/29/20123/29/2012PPASS
DetailsTroy Cobbley
Permit finaled. EOL voltage drops are acceptable.
INSP-Alarm Testing3/27/20123/29/20123/29/2012APASS
DetailsTroy Cobbley
Permit finaled
INSP-Alarm Testing3/27/20123/28/20123/27/2012ACANC
DetailsTroy Cobbley
We can meet at the loading dock on the west end of bldg6. Earlier in the morning the better. Thanks Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
Issue permit  3/20/2012 DONE
Payment received via Govolutions
Fees Due Hold3/15/2012 3/20/2012 DONE
Details
INSP-Alarm Testing3/13/20123/14/20123/14/2012AFAIL
DetailsTroy Cobbley
A strobe in the basement stairwell is overspaced. It originally had a symbol designation for the candella rating and no one knew what it stood for. The contractor installed a 15cd in its place prior to this inspection. This 15cd strobe is overspace for corridor spacing and for room spacing. It was agreed that a 75cd strobe would work and will be installed. As builts do not match the installation and will need to be revised. Still need to witness the sync'ing of the audio/visual devices and verify EOL. I offered to perform both of these services but my offer was declined due to the 15cd strobe issue and an acceptable way to verify the EOL not being agreed upon yet. A re-inspection fee as been assigned.
Telephone call  3/14/2012 DONE
I spoke with Troy Cobbley to let him know that it was okay for Simplexgrinnell to remove the exterior horns because they are not required by code.
INSP-Alarm Testing3/6/20123/7/20123/7/2012PDONE
DetailsTroy Cobbley
See the city approved plans for locations where a strobe needs to be added at the north end of an exit corridor, candella needs to be increased in a room. New horns are shown to be added around the Service building but have not been installed. The horns need to be installed or be approved by Boise City plan review to remain deleted. Additional strobes have been added in a restroom and others have been relocated to nearby walls. These and all other changes need to be shown on as-built plans. Per Brian, the simplex tech., the same EOL issues as the last project are present. I deferred him to Deputy Chief Gervais. No testing of the audio/visual circuits was performed.
Issue and Print Permit  2/14/2012 DONE
DetailsBarbara Stitt
Plan assigned to (Stephanie)2/3/2012 2/10/2012 DONE
DetailsStephanie L. Cobbley
Alarm Plan Check2/10/2012 2/10/2012 PASS
DetailsStephanie L. Cobbley
Resubmitted plans approved with redlines and review comments.
PLANS TAKEN FRONT DESK ALARM  2/10/2012 DONE
Approved redlined resubmittals available at front counter.
Inspection Record Card- Fire2/10/2012 2/10/2012 DONE
DetailsPatricia Smith
Telephone call  2/10/2012 DONE
left vm for bob - permit ready and fees given
Permit Ready to Issue  2/10/2012 DONE
Details
Plan assigned to (Stephanie)1/20/2012 2/10/2012 DONE
DetailsStephanie L. Cobbley
Plan assigned to (Stephanie)1/24/2012 2/10/2012 DONE
DetailsStephanie L. Cobbley
Plan resubmittals received  2/3/2012 DONE
DetailsChristina Prado
Received two copies of application, checklist, small docs and plans 1-11. Plans routed to Stephanie for review
1st review completed  2/1/2012 FAIL
Alarm Plan Check2/1/2012 2/1/2012 FAIL
DetailsStephanie L. Cobbley
Plans denied - a new NAC panel is required because the new devices exceed the existing panel's capacity. Other redlines need to be incorporated in the resubmittal.
Telephone call  2/1/2012 DONE
Spoke with Dante to let him know that the plans would need to be resubmitted since they need to add a new NAC panel.
Miscellaneous action  2/1/2012 DONE
Faxed the review comments to the contractor.
Miscellaneous action  2/1/2012 DONE
Denied plans taken to front counter for contractor to pick up.
Miscellaneous action  2/1/2012 DONE
DetailsTisha Gallop
Simplex picked up denied plans
Plan resubmittals received  1/26/2012 DONE
DetailsTisha Gallop
received 2nd set of application, submittal docs, and plans; taken to Steph
Application received  1/20/2012