INSP-Final Inspection | 3/21/2012 | 3/22/2012 | 3/22/2012 | A | PASS |
Forrest France
|
|
|
Final walkthrough passed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 3/14/2012 | 3/15/2012 | 3/16/2012 | A | PASS |
Forrest France
|
|
|
Remainder of overhead rough-in work approved for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2012 | 3/12/2012 | 3/12/2012 | P | PART |
Forrest France
|
|
|
Install missing coverage at the small entry vestibule adjoining two rooms per plan as discussed.
|
INSP-Sprinkler Rough-in | 2/17/2012 | 2/21/2012 | 2/21/2012 | A | PART |
Forrest France
|
|
|
Overhead install at the break and work rooms only approved for cover as marked and dated on stamped plans.
|
Plan assigned to (Tim) | 1/25/2012 | | 1/26/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/26/2012 | | 1/26/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 1/26/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 1/26/2012 | | 1/26/2012 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 1/26/2012 | | DONE |
|
|
|
t/c w brodie - permit ready and fees given
|
Permit Ready to Issue | | | 1/26/2012 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/26/2012 | | DONE |
|
|
|
|
Application received | | | 1/25/2012 | | |
|
|
|
|
Pending Assignment by SAM | 1/25/2012 | | 1/25/2012 | | DONE |
Patricia Smith
|
|
|
|