INSP-Final Inspection | 2/7/2012 | 2/8/2012 | 2/8/2012 | A | PASS |
Forrest France
|
|
|
Scope of work completed. Final inspection passed.
|
Issue and Print Permit | | | 2/6/2012 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/6/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/2/2012 | | 2/3/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/3/2012 | | 2/3/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/3/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/3/2012 | | 2/3/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 2/3/2012 | | |
|
|
|
|
Telephone call | | | 2/3/2012 | | DONE |
|
|
|
2-3-12 called left message permit ready and fee given ///dld
|
Application received | | | 2/2/2012 | | |
|
|
|
|
Pending Assignment by SAM | 2/2/2012 | | 2/2/2012 | | DONE |
Patricia Smith
|
|
|
|