Miscellaneous action | | | 2/14/2013 | | DONE |
|
|
|
Plans taken to records for scanning
|
Miscellaneous action | | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 3/21/2012 | 3/22/2012 | 3/22/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/20/2012 | 3/21/2012 | 3/21/2012 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Troy until the ceiling tile is installed.
|
INSP-Sprinkler Rough-in/Hydro | 3/20/2012 | 3/21/2012 | 3/21/2012 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed.
|
INSP-Final Inspection | 3/20/2012 | 3/20/2012 | 3/20/2012 | P | FAIL |
Troy Cobbley
|
|
|
Project is not ready for final. Piping needs to be hydro tested and the ceiling tile installed. Rough-in passed and the piping can be covered.
|
Issue and Print Permit | | | 3/20/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 2/9/2012 | | 3/19/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/19/2012 | | 3/19/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/19/2012 | | 3/19/2012 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 3/19/2012 | | DONE |
|
|
|
t/c w brad - permit ready and fees given
|
Permit Ready to Issue | | | 3/19/2012 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/15/2012 | | DONE |
Christina Prado
|
|
|
received three sets of applications, checklists and plans marked FP1-3. Routed to Tim Frost for additional review
|
Sprinkler Plan Check | 2/13/2012 | | 2/13/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/13/2012 | | FAIL |
Tim Frost
|
|
|
|
Case Summary | | | 2/9/2012 | | DONE |
|
|
|
|
Application received | | | 2/9/2012 | | |
|
|
|
|