Miscellaneous action | | | 2/14/2013 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 1/11/2013 | 1/23/2013 | 1/23/2013 | A | PASS |
Forrest France
|
|
|
Verified correction notice items have been finished. Fire alarm permit finaled.
|
INSP-Alarm Testing | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | PEND |
Forrest France
|
|
|
Final pending plan modification per activity notes dated 10/4.
|
INSP-Final Inspection | 9/25/2012 | 10/4/2012 | 10/4/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide plan modification showing the correct model number of the DSC panel that has been installed and provide map at the facp.
|
FIR-Aging Inspection | 9/21/2012 | 9/21/2012 | 9/24/2012 | | NR |
Troy Cobbley
|
|
|
Per Steve these DSC permits will be scheduled soon.
|
INSP-Final Inspection | 6/13/2012 | 6/15/2012 | 6/15/2012 | A | FAIL |
Forrest France
|
|
|
Communication failure needs repaired.
|
INSP-Conference | 5/14/2012 | 5/14/2012 | 5/15/2012 | A | DONE |
Forrest France
|
|
|
Regarding inspection schedule
|
Issue and Print Permit | | | 2/24/2012 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/24/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 2/16/2012 | | 2/23/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan assigned to (Stephanie) | 2/16/2012 | | 2/23/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 2/23/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 2/23/2012 | | 2/23/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 2/23/2012 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 2/23/2012 | | 2/23/2012 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/23/2012 | | DONE |
|
|
|
t/c w dante - permit ready and fees given
|
Permit Ready to Issue | | | 2/23/2012 | | DONE |
|
|
|
|
Application received | | | 2/16/2012 | | |
|
|
|
|