INSP-Sprinkler Rough-in | 2/22/2013 | 2/22/2013 | 6/17/2014 | P | DONE |
Tim Frost
|
|
|
*Re-assigned by Scott Arellano*
Need rough in for 1st and 2nd floors. Please call scott at ###-#### Phone #: ###-#### >> Inspection requested via web by Kindel de Leon
|
Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 6/14/2013 | 6/17/2013 | 6/17/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled. Basement transformer room meets exception per NFPA 13 8.15.10.3..
|
INSP-Sprinkler Rough-in | 6/3/2013 | 6/4/2013 | 6/6/2013 | P | PASS |
Forrest France
|
|
|
Need a RTC for the basement. Please call Trent 30 mins prior at ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
|
INSP-Sprinkler Rough-in | 5/28/2013 | 5/28/2013 | 5/28/2013 | P | PASS |
Forrest France
|
|
|
Verified noted adjustments to coverage at the 3rd to 2nd floor glass skylight, north and south stair tower 1st floor landings, EC heads at the first floor. 1st through 3rd floor work finished.
|
INSP-Sprinkler Rough-in | 5/7/2013 | 5/8/2013 | 5/9/2013 | A | PART |
Forrest France
|
|
|
Reinspection completed for items noted 4/23 third floor.
|
Plan assigned to (Tim) | 5/1/2013 | | 5/3/2013 | | DONE |
Tim Frost
|
|
|
received 1 application,3 plans ,1hydraulicinfo sheet,2 hydraulic design sheets sent to Tim F.
|
Sprinkler Plan Check | 5/3/2013 | | 5/3/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2013 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 5/3/2013 | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
Called Don to advise permit is ready for pick up and gave fees due
|
CHANGE STATUS TO (ISS) | | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
|
INSP-Sprinkler Rough-in | 4/22/2013 | 4/23/2013 | 4/23/2013 | A | FAIL |
Forrest France
|
|
|
Completed inspection for the remainder of work at the 3rd floor- vestibule at stair #2 now has a drop ceiling, coverge at electrical room adjacent to stair #3 is overspaced, comm room is not finished, five light fixture obstructions at the storage room. System 2 remote calc area #3 does not match field installation- pipe sizing, head type/layout, branchlines and room area are different.
|
INSP-Sprinkler Rough-in | 4/22/2013 | 4/22/2013 | 4/22/2013 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. Rescheduled for Tim in the morning.
|
INSP-Sprinkler Rough-in | 4/12/2013 | 4/12/2013 | 4/12/2013 | P | PART |
Forrest France
|
|
|
Previous C/N items okayed as dated on approved plans. Need to add coverage at the vestibule adjacent to stair 3, add hanger to new armover at the storage room, verify 20' spacing is okay at the SE hall.
|
INSP-Sprinkler Rough-in | 4/9/2013 | 4/10/2013 | 4/11/2013 | P | PART |
Forrest France
|
|
|
Inspection for cover at the 3rd floor grid ceilings installed to date- Noted items include three missing hangers, overspacing at two areas, one room and portion of a corridor are incomplete, modification to coverage at the elevator lobby.
|
INSP-Sprinkler Rough-in | 4/3/2013 | 4/3/2013 | 4/3/2013 | P | PART |
Forrest France
|
|
|
Coverage adjustments at the first floor office areas NW corner completed. Pendent heads changed to QR with the exception of the electrical room and one adjacent open office.
|
INSP-Sprinkler Rough-in | 4/1/2013 | 4/2/2013 | 4/2/2013 | A | PART |
Forrest France
|
|
|
Overhead work at the 3rd floor council chambers, meeting rooms, storage room, and two accessory rooms as marked and dated on approved plan set are approved for ceiling cover.
|
INSP-Sprinkler Rough-in | 2/19/2013 | 2/19/2013 | 2/19/2013 | P | PART |
Forrest France
|
|
|
Coverage adjustments at the 3rd floor east side soffits are complete- okayed for cover.
|
INSP-Sprinkler Rough-in | 2/7/2013 | 2/8/2013 | 2/8/2013 | A | FAIL |
Forrest France
|
|
|
Rough-in at the 3rd floor perimeter hard lid areas completed. Pendent heads in soffits at two locations including the NE and SE side as marked on approved plan set are overspaced- see dated annotations. Some ceilings okayed to cover- ref. plans, also noted possible shadowing at some areas.
|
FIR-Aging Inspection | 2/7/2013 | 2/7/2013 | 2/7/2013 | | DONE |
Forrest France
|
|
|
Site work in progress
|
CHANGE STATUS TO (ISS) | | | 12/26/2012 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/26/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 12/17/2012 | | 12/24/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/24/2012 | | 12/24/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/24/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 12/24/2012 | | 12/24/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 12/24/2012 | | |
|
|
|
|
Telephone call | | | 12/24/2012 | | |
|
|
|
12-24-12 called left message permit ready and fee given ///dld
|
Plan resubmittals received | | | 12/17/2012 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: Received three copies of application, submittal docs and plans; rotued to TRF
|
INSP-Sprinkler Rough-in | 11/7/2012 | 11/7/2012 | 11/8/2012 | A | PART |
Forrest France
|
|
|
Okay to cover work at the 1st floor lobby as marked on approved plan set. Provide clips at trapeeze hangers per discussion.
|
INSP-Sprinkler Rough-in | 10/2/2012 | 10/2/2012 | 10/2/2012 | A | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler work at the 3rd floor conference room 306.
|
INSP-Sprinkler Rough-in | 9/5/2012 | 9/6/2012 | 9/6/2012 | A | DONE |
Scott Arellano
|
|
|
Ok to cover.
|
INSP-Sprinkler Rough-in | 9/4/2012 | 9/5/2012 | 9/4/2012 | A | CANC |
Forrest France
|
|
|
Rough to Cover 2nd Floor Atrium - Scott Carter is the contact at ###-#### Phone #: ###-#### >> Inspection requested via web by Kindel de Leon Inspection cancelled from web by: Scott Carter II
|
INSP-Sprinkler Rough-in | 6/19/2012 | 6/20/2012 | 6/20/2012 | P | PART |
Forrest France
|
|
|
follow up inspection for second floor Phase 1; need approval for remainder to cover. Please call 1 hour before inspection-Scott Phone #: ###-#### >> Inspection requested via web by Scott Carter II *Okay to cover ceilings at the breakroom, conference room five, hall and permits desk areas.*
|
INSP-Sprinkler Rough-in | 6/6/2012 | 6/7/2012 | 6/8/2012 | P | PART |
Forrest France
|
|
|
Partial inspection for cover at areas completed to date 2nd floor only. Corrections include hanger attatchment at the breakroom, install does not match plan at the storage and mens restroom (four heads are supplied from 1" pipe), noted work completed in hatched plan areas at locations indicated as not affected, missing hanger above the permits desk. Cover at rooms approved where clouded and dated.
|
INSP-Sprinkler Rough-in | 6/5/2012 | 6/6/2012 | 6/7/2012 | P | NR |
Forrest France
|
|
|
Missing approved plans on site, noted missing seismic bracing, etc.
|
Sprinkler Plan Check | 3/26/2012 | | 3/26/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/26/2012 | | 3/26/2012 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 3/26/2012 | | |
|
|
|
3-26-12 called Don permit ready and fee given ///dld
|
Issue and Print Permit | | | 3/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 2/24/2012 | | 3/26/2012 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 3/21/2012 | | |
|
|
|
|
Sprinkler Plan Check | 3/16/2012 | | 3/16/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Miscellaneous action | | | 3/16/2012 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 3/16/2012 | | DONE |
|
|
|
left vm for don - permit denied - needs to be picked up and resubmitted
|
Plan resubmittals received | | | 3/13/2012 | | DONE |
Tisha Gallop
|
|
|
received three copies of application, submittal docuements and plans; routed to Fire Review.
|
Sprinkler Plan Check | 2/28/2012 | | 2/28/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/28/2012 | | FAIL |
|
|
|
|
Telephone call | | | 2/28/2012 | | DONE |
|
|
|
t/c don - permit denied - needs to be picked up and resubmitted
|
Miscellaneous action | | | 2/28/2012 | | DONE |
Tisha Gallop
|
|
|
contractor picked up denied plans
|
Application received | | | 2/24/2012 | | |
|
|
|
|