Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR12-00108
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 150 N CAPITOL BLVD
Project NameBOISE CITY HALL
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of renovations to the basement, 2nd and 3rd floors due to seismic upgrages. In addition, the atrium is being filled in with offices. The first floor is covered under permit FIR12-00017. Some areas in the basement are having fire protection added at this time. It is unknown why these areas were not sprinklered initially.


Building Department Scope:

(BOISE CITY HALL)(PHASE 1) Seismic structural upgrades and tenant improvements to all 4 floors & basement of City Hall Building 1 in the City Hall Building complex per approved plans. Total area of four stories is approximately 179,881 sq. ft. with a 63,312 sq. ft. basement used as a parking garage and mechanical equipment & maintenance office area. Work to include select interior demolition; preparation for and installation of seismic ties, connectors, concrete footings, concrete walls, steel beams, steel columns, steel & concrete structural elements at floor infill of atrium at 2nd and 3rd floors, adding additional usable floor area; providing fire-resistive assemblies or applications of listed products to maintain the required fire-resistive construction for Type I-B Construction; opening up the first floor lobby and remodeling of the clerk's office area and service counter; new interior walls to create new conference rooms, future tenant areas and work areas with relocated or new millwork work stations; new interior finishes or repair in areas of remodel; new roof assembly to include foam plastic roof insulation and single ply TPO roof membrane as per specs; upgrade and or relocation of electrical, mechanical, plumbing, fire suppression and alarm systems.NOTE: This building complex is fully sprinklered. Drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in2/22/20132/22/20136/17/2014PDONE
DetailsTim Frost
*Re-assigned by Scott Arellano*

Need rough in for 1st and 2nd floors. Please call scott at ###-#### Phone #: ###-#### >> Inspection requested via web by Kindel de Leon
Miscellaneous action  9/23/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
Miscellaneous action  9/23/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection6/14/20136/17/20136/17/2013APASS
DetailsForrest France
Fire sprinkler permit finaled. Basement transformer room meets exception per NFPA 13 8.15.10.3..
INSP-Sprinkler Rough-in6/3/20136/4/20136/6/2013PPASS
DetailsForrest France
Need a RTC for the basement. Please call Trent 30 mins prior at ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
INSP-Sprinkler Rough-in5/28/20135/28/20135/28/2013PPASS
DetailsForrest France
Verified noted adjustments to coverage at the 3rd to 2nd floor glass skylight, north and south stair tower 1st floor landings, EC heads at the first floor. 1st through 3rd floor work finished.
INSP-Sprinkler Rough-in5/7/20135/8/20135/9/2013APART
DetailsForrest France
Reinspection completed for items noted 4/23 third floor.
Plan assigned to (Tim)5/1/2013 5/3/2013 DONE
DetailsTim Frost
received 1 application,3 plans ,1hydraulicinfo sheet,2 hydraulic design sheets sent to Tim F.
Sprinkler Plan Check5/3/2013 5/3/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  5/3/2013 DONE
DetailsTim Frost
Inspection Record Card- Fire5/3/2013 5/3/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  5/3/2013 DONE
DetailsChristina Prado
Telephone call  5/3/2013 DONE
DetailsChristina Prado
Called Don to advise permit is ready for pick up and gave fees due
CHANGE STATUS TO (ISS)  5/3/2013 DONE
DetailsChristina Prado
INSP-Sprinkler Rough-in4/22/20134/23/20134/23/2013AFAIL
DetailsForrest France
Completed inspection for the remainder of work at the 3rd floor- vestibule at stair #2 now has a drop ceiling, coverge at electrical room adjacent to stair #3 is overspaced, comm room is not finished, five light fixture obstructions at the storage room. System 2 remote calc area #3 does not match field installation- pipe sizing, head type/layout, branchlines and room area are different.
INSP-Sprinkler Rough-in4/22/20134/22/20134/22/2013PCANC
DetailsTroy Cobbley
Overbooked. Rescheduled for Tim in the morning.
INSP-Sprinkler Rough-in4/12/20134/12/20134/12/2013PPART
DetailsForrest France
Previous C/N items okayed as dated on approved plans. Need to add coverage at the vestibule adjacent to stair 3, add hanger to new armover at the storage room, verify 20' spacing is okay at the SE hall.
INSP-Sprinkler Rough-in4/9/20134/10/20134/11/2013PPART
DetailsForrest France
Inspection for cover at the 3rd floor grid ceilings installed to date- Noted items include three missing hangers, overspacing at two areas, one room and portion of a corridor are incomplete, modification to coverage at the elevator lobby.
INSP-Sprinkler Rough-in4/3/20134/3/20134/3/2013PPART
DetailsForrest France
Coverage adjustments at the first floor office areas NW corner completed. Pendent heads changed to QR with the exception of the electrical room and one adjacent open office.
INSP-Sprinkler Rough-in4/1/20134/2/20134/2/2013APART
DetailsForrest France
Overhead work at the 3rd floor council chambers, meeting rooms, storage room, and two accessory rooms as marked and dated on approved plan set are approved for ceiling cover.
INSP-Sprinkler Rough-in2/19/20132/19/20132/19/2013PPART
DetailsForrest France
Coverage adjustments at the 3rd floor east side soffits are complete- okayed for cover.
INSP-Sprinkler Rough-in2/7/20132/8/20132/8/2013AFAIL
DetailsForrest France
Rough-in at the 3rd floor perimeter hard lid areas completed. Pendent heads in soffits at two locations including the NE and SE side as marked on approved plan set are overspaced- see dated annotations. Some ceilings okayed to cover- ref. plans, also noted possible shadowing at some areas.
FIR-Aging Inspection2/7/20132/7/20132/7/2013 DONE
DetailsForrest France
Site work in progress
CHANGE STATUS TO (ISS)  12/26/2012 DONE
(F) Reprint permit  12/26/2012 DONE
Plan assigned to (Tim)12/17/2012 12/24/2012 DONE
DetailsTim Frost
Sprinkler Plan Check12/24/2012 12/24/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  12/24/2012 DONE
DetailsTim Frost
Inspection Record Card- Fire12/24/2012 12/24/2012 DONE
DetailsDarla L Downs
Permit Ready to Issue  12/24/2012  
Telephone call  12/24/2012  
12-24-12 called left message permit ready and fee given ///dld
Plan resubmittals received  12/17/2012 DONE
DetailsTisha Gallop
Plan Modification: Received three copies of application, submittal docs and plans; rotued to TRF
INSP-Sprinkler Rough-in11/7/201211/7/201211/8/2012APART
DetailsForrest France
Okay to cover work at the 1st floor lobby as marked on approved plan set. Provide clips at trapeeze hangers per discussion.
INSP-Sprinkler Rough-in10/2/201210/2/201210/2/2012APART
DetailsForrest France
Okay to cover fire sprinkler work at the 3rd floor conference room 306.
INSP-Sprinkler Rough-in9/5/20129/6/20129/6/2012ADONE
DetailsScott Arellano
Ok to cover.
INSP-Sprinkler Rough-in9/4/20129/5/20129/4/2012ACANC
DetailsForrest France
Rough to Cover 2nd Floor Atrium - Scott Carter is the contact at ###-#### Phone #: ###-#### >> Inspection requested via web by Kindel de Leon Inspection cancelled from web by: Scott Carter II
INSP-Sprinkler Rough-in6/19/20126/20/20126/20/2012PPART
DetailsForrest France
follow up inspection for second floor Phase 1; need approval for remainder to cover. Please call 1 hour before inspection-Scott Phone #: ###-#### >> Inspection requested via web by Scott Carter II *Okay to cover ceilings at the breakroom, conference room five, hall and permits desk areas.*
INSP-Sprinkler Rough-in6/6/20126/7/20126/8/2012PPART
DetailsForrest France
Partial inspection for cover at areas completed to date 2nd floor only. Corrections include hanger attatchment at the breakroom, install does not match plan at the storage and mens restroom (four heads are supplied from 1" pipe), noted work completed in hatched plan areas at locations indicated as not affected, missing hanger above the permits desk. Cover at rooms approved where clouded and dated.
INSP-Sprinkler Rough-in6/5/20126/6/20126/7/2012PNR
DetailsForrest France
Missing approved plans on site, noted missing seismic bracing, etc.
Sprinkler Plan Check3/26/2012 3/26/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  3/26/2012 DONE
DetailsTim Frost
Inspection Record Card- Fire3/26/2012 3/26/2012 DONE
DetailsDarla L Downs
Telephone call  3/26/2012  
3-26-12 called Don permit ready and fee given ///dld
Issue and Print Permit  3/26/2012 DONE
DetailsTisha Gallop
Plan assigned to (Tim)2/24/2012 3/26/2012 DONE
DetailsTim Frost
Plan resubmittals received  3/21/2012  
Sprinkler Plan Check3/16/2012 3/16/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Miscellaneous action  3/16/2012 DONE
DetailsTim Frost
Emailed review to contractor
Telephone call  3/16/2012 DONE
left vm for don - permit denied - needs to be picked up and resubmitted
Plan resubmittals received  3/13/2012 DONE
DetailsTisha Gallop
received three copies of application, submittal docuements and plans; routed to Fire Review.
Sprinkler Plan Check2/28/2012 2/28/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  2/28/2012 FAIL
Telephone call  2/28/2012 DONE
t/c don - permit denied - needs to be picked up and resubmitted
Miscellaneous action  2/28/2012 DONE
DetailsTisha Gallop
contractor picked up denied plans
Application received  2/24/2012