Permit Information
Permit NumberFIR12-00116
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 12601 W BRIDGER ST
Project NameIDAHO POWER PHASE 1
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of a new 4” double interlock preaction system. The preaction valve feed a 3” main on a tree system with telescoping branch piping. A new 6” backflow preventer is to be added. The existing alarm valve is being relocated.



Building Department Scope:

IDAHO POWER PHASE 1 FPP permit previously MCI building built and finaled in 1994. Renovation of approximately 6000 sq ft to create a data floor complete with mechanical and electrical system upgrades and support space for IT distribution. Structure is fully engineered and designed for one hour construction that is not code driven but shall be constructed per plan. Fire alarm and sprinkler submittals are required to be submitted to the Boise City fire plan review for approvals. Inspections are to be direct contact with the inspectors. Building Jim Storey 794-9490/ Mechanical Troy James 794-9461/ Plumbing Jim Johnson 794-9476/ Electrical Daryl Degrange 794-1379/ Fire Forest France 794-1981
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  10/11/2012 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection7/31/20127/31/20127/31/2012PPASS
DetailsTroy Cobbley
Permit finaled
Telephone call  6/25/2012 DONE
Spoke with Tony at Viking. Field changes required adding 6 additional ells. This increase the pressure requirment by approxiately 2.5#. The project still has a substantial safey factor.
INSP-Sprinkler Rough-in/Hydro6/19/20126/20/20126/20/2012PPASS
DetailsTroy Cobbley
24 hour air test passed for the pre-action system
INSP-Sprinkler Rough-in/Hydro6/19/20126/19/20126/19/2012PPART
DetailsTroy Cobbley
24 hour air test started at 1:30 with 44 psi on the guage.
INSP-Sprinkler Rough-in6/12/20126/13/20126/13/2012PPASS
DetailsTroy Cobbley
Overhead hydro tests on the dry and wet systems passed. Still need 24 hour air test on the dry. Rough-in for the sprinkler piping in the data room passed and the piping can be covered. The wet system piping rough-in passeed. Plan review needs to be contacted about modified hydraulic calculations due to the additional 2" elbows that have been added between the remote area and the supply.
Sprinkler Plan Check3/13/2012 3/13/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  3/13/2012 DONE
DetailsTim Frost
Inspection Record Card- Fire3/13/2012 3/13/2012 DONE
DetailsPatricia Smith
Telephone call  3/13/2012 DONE
t/c w tony - permit ready and fees given
Permit Ready to Issue  3/13/2012 DONE
Details
Issue and Print Permit  3/13/2012  
Plan assigned to (Tim)2/29/2012 3/13/2012 DONE
DetailsTim Frost
Telephone call  3/8/2012 DONE
Spoke with Tony Larson. Advised, him that I needed additional information from Drake plumbing. However, the person i need to talk with at Drake is out of the office until monday. Asked him if It was Ok to put his project on hold until Monday. He was aggreeable.
Telephone call  3/8/2012 DONE
Spoke with Drake Plumbing. The person I need to talk with is out of the office until Monday.
Plan resubmittals received  3/7/2012 DONE
DetailsTisha Gallop
received three copies of application, submittal documents and plans; routed to Fire Review.
Sprinkler Plan Check3/5/2012 3/5/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  3/5/2012 FAIL
DetailsTim Frost
Miscellaneous action  3/5/2012 DONE
DetailsTim Frost
Emailed review to contractor
Telephone call  3/5/2012 DONE
left message with melissa - permit denied - needs to be picked up and resubmitted
Application received  2/29/2012  
Case Summary  2/29/2012 DONE