Information based on query as of Thursday, September 26, 2024.
Permit Information
Permit NumberFIR12-00127
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 350 N MILWAUKEE ST Unit: 2128
Project NameBTS #2128 - CHAMPS
Customer Number 
ePlanReviewNo
Description
(CHAMPS / Foot Locker - BOISE TOWNE SQUARE - SPACE # 2128) To remodel an existing 4,505 square foot retail store by combining it with one small tenant space and part of the mall common area increasing this tenant space to 5,950 square feet. Work to include: [installation of interior non-bearing partition walls to create: [a stockroom, a sales area, unisex accessible restroom, fitting rooms, accessible fitting room, and a hallway], installation of new flooring throughout, construction of a new storefront area, installation of suspended ceiling system per CISCA 0-2, new lighting, revise mechanical ducting only, new plumbing, and interior finishes in compliance with ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks (Racking permit attached to this permit/plans under case number BLD11-03037). NOTE: a separate sign permit for interior mall signage is required before sign installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  4/24/2012 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection4/4/20124/4/20124/4/2012PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in4/2/20124/2/20124/2/2012PCANC
DetailsTroy Cobbley
duplicate inspection
INSP-Final Inspection4/2/20124/2/20124/2/2012PFAIL
DetailsTroy Cobbley
Three upright sprinkler heads are painted/covered over the sales floor, two esch. are missing at the main exit, sprinkler protection needs to be provided in the empty spaced created by the new tenant demizing wall as discussed.
Sprinkler Plan Check3/7/2012 3/7/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  3/7/2012 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  3/7/2012 DONE
DetailsTim Frost
Inspection Record Card- Fire3/7/2012 3/7/2012 DONE
DetailsPatricia Smith
Telephone call  3/7/2012 DONE
t/c w jeff - permit ready and fees given
Permit Ready to Issue  3/7/2012 DONE
Details
Issue and Print Permit  3/7/2012 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)3/6/2012 3/7/2012 DONE
DetailsTim Frost
Application received  3/6/2012  
Case Summary  3/6/2012 DONE