Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR12-00136
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameMICRON
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of providing active fire protection for selected structural steel members per signed alternate dated 02-15-12.

Note: See permit FIR11-00301, FIR11-00365, FIR11-0431, FIR11-00448, FIR11-00524, FIR11-00645, FIR11-00658, FIR11-00659, FIR11-00689, FIR12-00102 for the review on other portions of this building


Building Department Scope:

Micron Building B50 - R&D Building - To construct a new 111,005 square foot, two story, with 71,855 square foot basement, concrete and steel semiconductor fabrication R & D facility and related site improvements. The first floor level is 89, 435 sq. ft. (60,100 sq. ft. finished and 29,325 sq. ft. unfinished). The second floor is a 21,570 sq. ft. mechanical space (16,170 sq. ft. used and 5,400 square feet future). The basement level (subfab.) has 43,295 sq. ft. finished and 28,560 unfinished. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/23/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection12/19/201212/19/201212/19/2012APASS
DetailsForrest France
FIR-Aging Inspection9/27/20129/27/20129/28/2012 PEND
DetailsForrest France
INSP-Sprinkler Rough-in4/9/20124/10/20124/10/2012PPART
DetailsForrest France
Rough-in inspection completed.
INSP-Sprinkler Rough-in4/5/20124/6/20124/6/2012PCANC
DetailsForrest France
Overbooked
Fees Due Hold4/5/2012 4/5/2012 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)3/13/2012 4/4/2012 DONE
DetailsTim Frost
Plan resubmittals received  4/4/2012 DONE
DetailsTisha Gallop
received three copies of application; routed to Tim Frost
Sprinkler Plan Check4/4/2012 4/4/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  4/4/2012 DONE
DetailsTim Frost
Inspection Record Card- Fire4/4/2012 4/4/2012 DONE
DetailsBarbara Stitt
Permit Ready to Issue  4/4/2012 DONE
DetailsBarbara Stitt
Telephone call  4/4/2012  
Emailed Paul that permit is ready & fees due on 4-4-12 @ 3:05pm//BAS
Issue and Print Permit  4/4/2012 DONE
DetailsBarbara Stitt
Plan resubmittals received  3/30/2012  
Sprinkler Plan Check3/15/2012 3/15/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  3/15/2012 FAIL
DetailsTim Frost
Miscellaneous action  3/15/2012 DONE
DetailsTim Frost
Emailed review to contractor
Telephone call  3/15/2012 DONE
DetailsTisha Gallop
e-mailed Paul Marcolina plans denied and they will be at the permit desk to pick up. 12:08pm
Application received  3/13/2012