INSP-Final Inspection | 4/18/2012 | 4/18/2012 | 4/19/2012 | A | PASS |
Forrest France
|
|
|
Final walkthrough passed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 3/23/2012 | 3/26/2012 | 3/26/2012 | A | PART |
Forrest France
|
|
|
Overhead work as marked on stamped plans is approved for cover at the grid ceilings.
|
Issue and Print Permit | | | 3/20/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 3/16/2012 | | 3/19/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/19/2012 | | 3/19/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 3/19/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/19/2012 | | 3/19/2012 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 3/19/2012 | | DONE |
|
|
|
t/c w brad - permit ready and fees given
|
Permit Ready to Issue | | | 3/19/2012 | | DONE |
|
|
|
|
Application received | | | 3/16/2012 | | |
|
|
|
|
Pending Assignment by SAM | 3/16/2012 | | 3/16/2012 | | DONE |
Patricia Smith
|
|
|
|