Miscellaneous action | | | 9/26/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 7/27/2012 | 7/31/2012 | 7/31/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Permit Ready to Issue | | | 7/17/2012 | | |
|
|
|
|
Telephone call | | | 7/17/2012 | | |
|
|
|
7-17-12 called Dante- Simplex Grinnell permit ready and fee given ///dld
|
Issue and Print Permit | | | 7/17/2012 | | DONE |
|
|
|
|
Alarm Plan Check | 7/16/2012 | | 7/16/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 7/16/2012 | | DONE |
|
|
|
Approved redlined plans taken to permit technician for processing.
|
Inspection Record Card- Fire | 7/16/2012 | | 7/16/2012 | | DONE |
Darla L Downs
|
|
|
|
Plan assigned to (Stephanie) | 6/29/2012 | | 7/16/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 7/13/2012 | | DONE |
|
|
|
Called Dante at SimplexGrinnell to get clarification. The riser indicates 14awg for the existing NAC#3, however the voltage drops were calc'd at 12awg. In addition, on the voltage drops for NAC#3, the actual % voltage drop was not shown (it was shown for NAC#4). I asked Danted to please email me the voltage drops and clarify the wire guage.
|
Miscellaneous action | | | 7/13/2012 | | DONE |
|
|
|
Received requested information.
|
Plan resubmittals received | | | 6/29/2012 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: received two copies of app, submittal folder and plans; routed to Fire review.
|
INSP-Alarm Testing | 6/28/2012 | 6/28/2012 | 6/28/2012 | P | DONE |
Troy Cobbley
|
|
|
Todays inspection was to finish out phase I. The CRAC units were tested and functioned/shutdown correctly. The induct detectors are being used for hvac unit shutdown and fire/smoke damper operation. The induct detectors can not be used for hvac unit shutdown due to the air flow exceeding the listed range of the detector. The induct detectors can not be used for the damper operation because they do not meet the requirements of IMC 607.3.3.2. After a discussion it appears the VESDA system may provide a solution for both issues by meeting the "total area coverage" option of IMC section 606 and 607. Whatever the solution, it needs to be approved by Boise City Plan Review.
|
INSP-Alarm Testing | 6/25/2012 | 6/27/2012 | 6/27/2012 | A | DONE |
Troy Cobbley
|
|
|
To complete phase I the fire dampers and the hvac unit shutdown needs to be tested. Interconnections with the clean agent system and the pre-action system have been completed. Supervision of the NAC panels has been verified. Several strobes are overspaced and candella's mislabeled on the plans. Plans need to be submitted showing the phase 3 work.
|
INSP-Conference | 6/19/2012 | 6/22/2012 | 6/22/2012 | A | DONE |
Troy Cobbley
|
|
|
Brian Anderson and I went over the fire alarm plans. Per redlined drawings as-builts are required due to the notification circuit. Some addressing has changed, NAC panel location has changed, the function of some modules has changed. Also per conversation with the fire alarm plan reviewer resubmittals are going to be required since the fire alarm permit scope of work does not match the building plans scope of work. Brian was going to check with his office on this.
|
CHANGE STATUS TO (ISS) | | | 5/2/2012 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary | | | 5/2/2012 | | DONE |
Tisha Gallop
|
|
|
|
Alarm Plan Check | 4/27/2012 | | 4/27/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modifications approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 4/27/2012 | | DONE |
|
|
|
Approved redlined plan modifications available at front counter.
|
Inspection Record Card- Fire | 4/27/2012 | | 4/27/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 4/27/2012 | | |
|
|
|
|
Telephone call | | | 4/27/2012 | | |
|
|
|
4-27-12 called Dante permit ready and fee given ///dld
|
Plan assigned to (Stephanie) | 4/24/2012 | | 4/27/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan resubmittals received | | | 4/24/2012 | | |
|
|
|
Plan modification
|
Issue and Print Permit | | | 4/12/2012 | | DONE |
Barbara Stitt
|
|
|
|
Alarm Plan Check | 4/11/2012 | | 4/11/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 4/11/2012 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 4/11/2012 | | 4/11/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 4/11/2012 | | |
|
|
|
|
Telephone call | | | 4/11/2012 | | |
|
|
|
4-11-12 called left message permit ready and fee given ///dld
|
Plan assigned to (Stephanie) | 3/20/2012 | | 4/11/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan assigned to (Stephanie) | 3/21/2012 | | 4/11/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan resubmittals received | | | 4/10/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of application, submittal folder and plans; routed to Fire Review.
|
1st review completed | | | 4/5/2012 | | FAIL |
|
|
|
|
Alarm Plan Check | 4/5/2012 | | 4/5/2012 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied - see review comments and redlined plans
|
Miscellaneous action | | | 4/5/2012 | | DONE |
|
|
|
Faxed review comments to contractor
|
Miscellaneous action | | | 4/5/2012 | | DONE |
|
|
|
Emailed contractor to let them know the denied plans are available at the permit counter.
|
Miscellaneous action | | | 4/5/2012 | | DONE |
|
|
|
Took the denied plans to the permit counter for contractor to pick up.
|
1st review completed | | | 4/3/2012 | | DEFR |
|
|
|
Contractor requested another of their submittals be reviewed in place of this one.
|
Telephone call | | | 4/2/2012 | | DONE |
|
|
|
Per a phone voicemail from Charlie Bayne, he would like me to review FIR11-00569 (plan modification submitted today) in place of this permit. This permit will be reviewed as if it were submitted today.
|
Application received | | | 3/20/2012 | | |
|
|
|
|