INSP-Final Inspection | 6/14/2012 | 6/15/2012 | 6/15/2012 | A | PASS |
Forrest France
|
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 6/7/2012 | 6/8/2012 | 6/8/2012 | A | PART |
Forrest France
|
|
|
Overhead work at the waiting and adjacent hall areas are approved for cover.
|
INSP-Sprinkler Rough-in | 6/4/2012 | 6/4/2012 | 6/4/2012 | A | PART |
Forrest France
|
|
|
See dated plan annotations for locations okayed for drop ceiling cover.
|
INSP-Sprinkler Rough-in | 5/16/2012 | 5/16/2012 | 5/16/2012 | P | PART |
Forrest France
|
|
|
Overhead work at the shared physician office and office #2 are okay for ceiling cover.
|
Plan assigned to (Tim) | 3/27/2012 | | 3/28/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/28/2012 | | 3/28/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 3/28/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/28/2012 | | 3/28/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 3/28/2012 | | |
|
|
|
|
Telephone call | | | 3/28/2012 | | |
|
|
|
3-28-12 called Brodie permit ready and fee given ///dld
|
Issue and Print Permit | | | 3/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 3/27/2012 | | |
|
|
|
|