Case Summary | | | 1/30/2014 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/14/2013 | 8/15/2013 | 8/15/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 8/13/2013 | 8/14/2013 | 8/14/2013 | A | FAIL |
Troy Cobbley
|
|
|
Basement fire alarm is complete (smoke detector was relocated and pull station lowered for my return trip). First floor fire alrm is complete (except updated as-builts are needed showing one additional in-duct detector). Second floor fire alarm is almost complete (Need to test all duct detectors, add two a/v's as marked on the plans)
|
CHANGE STATUS TO (ISS) | | | 8/13/2013 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 8/13/2013 | | DONE |
|
|
|
|
Alarm Plan Check | 8/9/2013 | | 8/9/2013 | | PASS |
Lee G Meredith
|
|
|
Plan modifications approved with redline comments on plans and matrix. All previous redlines and review comments still apply.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/9/2013 | | DONE |
Lee G Meredith
|
|
|
Approved plan modifications taken to front desk for processing.
|
Permit Ready to Issue | | | 8/9/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 8/9/2013 | | 8/9/2013 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 8/9/2013 | | |
|
|
|
8-9-13 called RME permit ready
|
INSP-Alarm Testing | 8/6/2013 | 8/8/2013 | 8/8/2013 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for an elevator test but I could not perform the test since the monitoring was not set up yet. I then did a walk through of the first and second floors to verify a/v spacing. I found many a/v's are overspaced most of which were in the restrooms. Many a/v's are missing/have not been installed. The multiple rooms in the Kitchen Area are not built yet and notification has not been installed. The Copy Room has been changed into an office and the a/v deleted. Most of the 15cd a/v in the corridors are mounted above 10' which is too high. Per the installed 12 in-duct detectors have been added. The main elevator, per the contractor, is being "grand fathered" by the state of Idaho and will not be required to have recall as shown on the plans. I did not inspect the basement. Plan modifications are required prior to additional inspections and final sign off.
|
Plan resubmittals received | | | 8/8/2013 | | |
|
|
|
8-8-13 received 1 re-submittal checklist and 2 sets of plans sent to Lee M
|
FIR-Aging Inspection | 8/6/2013 | 8/6/2013 | 8/6/2013 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
FIR-Aging Inspection | 5/7/2013 | 5/7/2013 | 5/8/2013 | | NR |
Troy Cobbley
|
|
|
Work is in progess
|
Plan assigned to (Stephanie) | 2/27/2013 | | 3/6/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 3/6/2013 | | 3/6/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modifications approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 3/6/2013 | | DONE |
|
|
|
Approved plan modifications taken to permit technician for processing
|
Permit Ready to Issue | | | 3/6/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 3/6/2013 | | 3/6/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 3/6/2013 | | DONE |
Christina Prado
|
|
|
called Nathan to advise plan mod is ready and gave fees due
|
(F) Reprint permit | | | 3/6/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 2/27/2013 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: Received two copies of application, submittal folder and plans; routed to SLC.
|
FIR-Aging Inspection | 2/5/2013 | 2/5/2013 | 2/13/2013 | | NR |
Troy Cobbley
|
|
|
|
FIR-Aging Inspection | 9/28/2012 | 9/28/2012 | 9/28/2012 | | NR |
Troy Cobbley
|
|
|
Per Clint the project is currently suspended but might possibly start back up.
|
Issue and Print Permit | | | 4/18/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 4/5/2012 | | 4/16/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 4/16/2012 | | 4/16/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 4/16/2012 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/16/2012 | | 4/16/2012 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 4/16/2012 | | |
|
|
|
4-16-12 called Enterprise Electric permit ready and fee given ///dld
|
Permit Ready to Issue | | | 4/16/2012 | | |
|
|
|
|
Plan resubmittals received | | | 4/12/2012 | | DONE |
Tisha Gallop
|
|
|
received application and two coipes submittal folder and plans; routed to Fire Review.
|
1st review completed | | | 4/11/2012 | | FAIL |
|
|
|
|
Alarm Plan Check | 4/11/2012 | | 4/11/2012 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied - please see redlines and review comments.
|
Miscellaneous action | | | 4/11/2012 | | DONE |
|
|
|
faxed review comments to contractor
|
Miscellaneous action | | | 4/11/2012 | | DONE |
|
|
|
emailed fire alarm vendor per request to let him know that the plans are denied.
|
Miscellaneous action | | | 4/11/2012 | | DONE |
|
|
|
denied plans taken to front counter for contractor to pick up.
|
Application received | | | 4/5/2012 | | |
|
|
|
|