Miscellaneous action | | | 7/12/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 6/21/2012 | 6/22/2012 | 6/22/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 6/12/2012 | 6/12/2012 | 6/12/2012 | P | FAIL |
Troy Cobbley
|
|
|
Three pendant sprinkler heads are located too far off of a south wall which gives them an overall spacing of 140 sq. ft. per head. 130 sq. ft. per head is maximum. Also I need as-builts due to an existing line shown as 1 1/2" but is actually 3" in size. I did give Max, the project superintendant, permission to cover. I will verify the three relocated heads at the final.
|
Issue and Print Permit | | | 4/16/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 4/10/2012 | | 4/13/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/13/2012 | | 4/13/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/13/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/13/2012 | | 4/13/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 4/13/2012 | | |
|
|
|
|
Telephone call | | | 4/13/2012 | | |
|
|
|
4-13-12 called Shilo permit ready and fee given ///dld
|
Application received | | | 4/10/2012 | | |
|
|
|
|