Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 10/24/2012 | 10/24/2012 | 10/30/2012 | P | PASS |
Forrest France
|
|
|
Coverage below chem trays and ductwork center east to be provided under a separate FIR permit. Per agreement with contractor this work to be completed prior to project related BLD final.
|
INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 | P | PART |
Forrest France
|
|
|
Upright sprinklers provided under north and south side round ducts, one leak at a swing joint repaired.
|
INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 | A | PART |
Forrest France
|
|
|
Pending coverage below ductwork obstructions.
|
FIR-Aging Inspection | 9/27/2012 | 9/27/2012 | 9/28/2012 | | PEND |
Forrest France
|
|
|
|
INSP-Final Inspection | 6/25/2012 | 6/26/2012 | 6/26/2012 | P | PART |
Forrest France
|
|
|
Overhead rough-in passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/25/2012 | 6/26/2012 | 6/26/2012 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test completed.
|
INSP-Sprinkler Rough-in/Hydro | 6/14/2012 | 6/15/2012 | 6/15/2012 | P | NR |
Forrest France
|
|
|
Charles Phone #: ###-#### *rescheduled per contractor request
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2012 | 6/12/2012 | 6/12/2012 | P | NR |
Forrest France
|
|
|
Hydrostatic test rescheduled per contractor request.
|
CHANGE STATUS TO (ISS) | | | 5/15/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
(F) Reprint permit | | | 5/15/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan assigned to (Tim) | 5/3/2012 | | 5/7/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/7/2012 | | 5/7/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 5/7/2012 | | 5/7/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 5/7/2012 | | |
|
|
|
|
Telephone call | | | 5/7/2012 | | |
|
|
|
5-7-12 called ###-#### left message permit ready and fee given ///dld
|
Plan resubmittals received | | | 5/3/2012 | | DONE |
Christina Prado
|
|
|
***PLAN MOD*** Received three sets of applications; checklists; calcs and plans marked FP of 18, FP-2 & FP3 of 11. Plans given to Tim Frost for further review
|
Plan assigned to (Tim) | 4/12/2012 | | 4/16/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/16/2012 | | 4/16/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/16/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/16/2012 | | 4/16/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 4/16/2012 | | |
|
|
|
|
Telephone call | | | 4/16/2012 | | |
|
|
|
4-16-12 called Shilo permit ready and fee given ///dld
|
Issue and Print Permit | | | 4/16/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 4/12/2012 | | DONE |
Barbara Stitt
|
|
|
|