INSP-Final Inspection | 5/3/2012 | 5/3/2012 | 5/3/2012 | A | PASS |
Forrest France
|
|
|
Permit finaled.
|
INSP-Sprinkler Rough-in | 5/3/2012 | 5/3/2012 | 5/3/2012 | A | PART |
Forrest France
|
|
|
Hood suppression system operated correctly under test conditions.
|
Meeting | | | 5/3/2012 | | DONE |
Scott Arellano
|
|
|
Per meeting with PDS/Mechanical division inspectors, (Troy Jame & Alan Hauser); activation of the exhaust hood assembly for appliance operation may have two sources of initiation; automatic (viahood temperature sensing mechanism) or a manual activation switch. The exhaust hood assembly shall comply with the mechanical divisions standards for approval.
|
INSP-Sprinkler Rough-in | 5/1/2012 | 5/2/2012 | 5/2/2012 | A | CANC |
Troy Cobbley
|
|
|
Per Kenny, when he left the job site at 12:30 the fan still had not been repaired. He stated that he would call in a re-inspection when it was fixed. Re-inspection by me was not performed.
|
INSP-Sprinkler Rough-in/Hydro | 4/30/2012 | 5/2/2012 | 5/2/2012 | A | FAIL |
Troy Cobbley
|
|
|
Exhaust hood did not function. The electrician is trouble shooting it.
|
Application received | | | 4/19/2012 | | |
|
|
|
|
Issue and Print Permit | | | 4/19/2012 | | DONE |
Christina Prado
|
|
|
|