Miscellaneous action | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 10/2/2012 | 10/4/2012 | 10/4/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
CHANGE STATUS TO (ISS) | | | 7/9/2012 | | |
|
|
|
this permit was put into the rev status by mistake ///dld
|
Plan assigned to (Tim) | 7/6/2012 | | 7/9/2012 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 7/6/2012 | | DONE |
Christina Prado
|
|
|
Plan Mod*** received three new sets of applications; checklists; calcs and plans. Gave to TIm Frost for further review
|
INSP-Supply line flush | 5/3/2012 | 5/3/2012 | 5/3/2012 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | PART |
Forrest France
|
|
|
UG fire supply line approved for bury. Discussed bedding material install with contractor.
|
Issue and Print Permit | | | 5/2/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan assigned to (Tim) | 4/23/2012 | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/24/2012 | | 4/24/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/24/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/24/2012 | | 4/24/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 4/24/2012 | | |
|
|
|
|
Telephone call | | | 4/24/2012 | | |
|
|
|
4-24-12 called George Mclean permit ready and fee given ///dld
|
Application received | | | 4/23/2012 | | |
|
|
|
|