Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 2/25/2013 | 2/25/2013 | 2/25/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 2/21/2013 | 2/21/2013 | 2/25/2013 | | PASS |
Troy Cobbley
|
|
|
|
INSP-Sprinkler Rough-in | 11/21/2012 | 11/21/2012 | 11/21/2012 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the area in the existing building where the sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/22/2012 | 10/22/2012 | 10/22/2012 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Supply line flush | 10/22/2012 | 10/22/2012 | 10/22/2012 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled per Perly due to United Water not having the underground supply turn on.
|
INSP-Sprinkler Rough-in | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Troy Cobbley
|
|
|
Underground Rough In passed. Remaining piping ok for cover.
|
INSP-Sprinkler Rough-in | 6/20/2012 | 6/21/2012 | 6/21/2012 | A | PASS |
Troy Cobbley
|
|
|
Underground rough in inspection for the riser stub out is passed.
|
Issue and Print Permit | | | 4/30/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan assigned to (Tim) | 4/23/2012 | | 4/25/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/25/2012 | | 4/25/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/25/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/25/2012 | | 4/25/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 4/25/2012 | | |
|
|
|
|
Telephone call | | | 4/25/2012 | | |
|
|
|
4-25-12 called Phoenix Fire permit ready and fee given ///dld
|
Application received | | | 4/23/2012 | | |
|
|
|
|
Pending Assignment by SAM | 4/23/2012 | | 4/23/2012 | | DONE |
Tisha Gallop
|
|
|
|