Miscellaneous action | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 8/1/2012 | 8/3/2012 | 8/3/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/31/2012 | 8/1/2012 | 8/1/2012 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Jeff since the project related fire alarm permit has not been scheduled.
|
INSP-Final Inspection | 7/30/2012 | 7/31/2012 | 7/31/2012 | A | CANC |
Troy Cobbley
|
|
|
Canceled per Jeff Phone #: ###-####. Fire alarm contractor is not there.
|
Issue and Print Permit | | | 7/10/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/6/2012 | | 7/9/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/9/2012 | | 7/9/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/9/2012 | | 7/9/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 7/9/2012 | | |
|
|
|
|
Telephone call | | | 7/9/2012 | | |
|
|
|
7-9-12 called American Fire Protection -permit ready and fee given ///dld
|
Plan resubmittals received | | | 7/6/2012 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: Received three copies of application, submittal documents and plans; routed to fire reveiw.
|
INSP-Sprinkler Rough-in/Hydro | 7/2/2012 | 7/2/2012 | 7/2/2012 | P | PART |
Troy Cobbley
|
|
|
Hydro test passed. Sprinkler piping above the lay-in ceiling tile is ok to cover. Plans and hydraulic calculations need to be resubmitted showing the 1 1/4" far main. The plans and calculations show the piping as 1 1/2" piping. Need the pressure relief valve installed.
|
INSP-Sprinkler Rough-in/Hydro | 6/4/2012 | 6/5/2012 | 6/5/2012 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro test and rough-in of the north canopy dry system passed. The earth quake bracing on the main has not been installed yet.
|
INSP-Sprinkler Rough-in | 6/5/2012 | 6/5/2012 | 6/5/2012 | P | PASS |
Troy Cobbley
|
|
|
This entry is for an inspection called in under FIR12-00175 on 5/17/2012.
The overhead hydro test passed. The sprinkler piping in the Sanctuary/Fellowship areas is ok to cover.
|
Issue and Print Permit | | | 5/17/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/4/2012 | | 5/7/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/7/2012 | | 5/7/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 5/7/2012 | | 5/7/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 5/7/2012 | | |
|
|
|
|
Telephone call | | | 5/7/2012 | | |
|
|
|
5-7-12 called American Fire Protection permit ready and fee given ///dld
|
Plan assigned to (Tim) | 5/1/2012 | | 5/7/2012 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 5/2/2012 | | 5/7/2012 | | DONE |
Tim Frost
|
|
|
put in ready mode by mistake ///dld
|
Plan resubmittals received | | | 5/4/2012 | | DONE |
Christina Prado
|
|
|
Received three sets of applications; checklists; Idaho Power Document; Calcs and plans marked FP1 of 1. Given to Tim Frost for review
|
Sprinkler Plan Check | 5/2/2012 | | 5/2/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 5/2/2012 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/2/2012 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Application received | | | 5/1/2012 | | |
|
|
|
|
Case Summary | | | 5/1/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|