INSP-Final Inspection | 5/24/2012 | 5/25/2012 | 5/25/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final walkthrough.
|
INSP-Final Inspection | 5/22/2012 | 5/24/2012 | 5/24/2012 | P | PART |
Forrest France
|
|
|
Scope of work is finished. Permit final pending field ceiling tile installation.
|
INSP-Sprinkler Rough-in | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover.
|
Issue and Print Permit | | | 5/9/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 5/8/2012 | | |
|
|
|
|
Plan assigned to (Tim) | 5/8/2012 | | 5/8/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/8/2012 | | 5/8/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 5/8/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 5/8/2012 | | 5/8/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 5/8/2012 | | |
|
|
|
|
Telephone call | | | 5/8/2012 | | |
|
|
|
5-8-12 called Absolute Fire Protection permit ready and fee given ///dld
|