Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 2/11/2013 | 2/12/2013 | 2/12/2013 | A | PASS |
Forrest France
|
|
|
Final walkthrough completed satisfactory. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 2/11/2013 | 2/11/2013 | 2/11/2013 | P | PART |
Forrest France
|
|
|
Riser supervision tested satisfactory, low air switch adjusted while on site, forward flow completed.
|
INSP-Sprinkler Rough-in/Hydro | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PART |
Forrest France
|
|
|
Concluded satisfactory air test of the new dry system with no pressure loss at the guage. Also finished hydrostatic testing of the wet system.
|
INSP-Sprinkler Rough-in/Hydro | 12/6/2012 | 12/6/2012 | 12/7/2012 | P | PART |
Forrest France
|
|
|
Begin 24 hr. air test 12/5 12:30 PM @ 40psig. on the new dry system.
|
INSP-Sprinkler Rough-in | 12/3/2012 | 12/3/2012 | 12/3/2012 | P | PASS |
Troy Cobbley
|
|
|
See the city approved drawings for locations marked in red where sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 11/19/2012 | 11/19/2012 | 11/19/2012 | A | PART |
Forrest France
|
|
|
Okay to cover hard lid ceilings at the common areas west wing.
|
INSP-Sprinkler Rough-in | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | PART |
Forrest France
|
|
|
Pendent heads at the sheetrock ceilings in the physical therapy room are approved for cover.
|
INSP-Sprinkler Rough-in | 10/24/2012 | 10/24/2012 | 10/24/2012 | P | PART |
Forrest France
|
|
|
Heads at drop ceilings in the east and west wing corridors okay for cover, heads in sheetrock ceilings at the dining area restrooms and soffits completed to date also approved for cover.
|
INSP-Sprinkler Rough-in | 9/10/2012 | 9/11/2012 | 9/11/2012 | A | PART |
Forrest France
|
|
|
Pendent heads at the nurse station 135 sheetrock ceiling are approved for cover.
|
INSP-Sprinkler Rough-in | 8/29/2012 | 8/29/2012 | 8/30/2012 | P | PART |
Forrest France
|
|
|
Okay to cover pendent and SW heads above the sheetrock ceilings at the east wing resident rooms.
|
INSP-Sprinkler Rough-in | 8/27/2012 | 8/27/2012 | 8/27/2012 | A | PART |
Forrest France
|
|
|
Dry system at the front entry vaults passed rough-in inspection.
|
INSP-Sprinkler Rough-in/Hydro | 8/24/2012 | 8/24/2012 | 8/24/2012 | P | PART |
Forrest France
|
|
|
Hydrostatic test of the new dry system passed after repairs made.
|
INSP-Sprinkler Rough-in | 8/23/2012 | 8/23/2012 | 8/23/2012 | P | PART |
Forrest France
|
|
|
Regarding dry system hydrostatic test and 12 missing dry SW heads.
|
INSP-Sprinkler Rough-in | 8/13/2012 | 8/13/2012 | 8/13/2012 | A | PART |
Forrest France
|
|
|
Non-sprinklered overbuilds at the east wing verified for insulation fill to meet allowable exceptions per NFPA.
|
INSP-Sprinkler Rough-in | 7/31/2012 | 7/31/2012 | 7/31/2012 | P | PART |
Forrest France
|
|
|
Overhead rough-in at the kitchen area as marked and dated on stamped plans okayed.
|
INSP-Sprinkler Rough-in | 7/16/2012 | 7/16/2012 | 7/16/2012 | P | PART |
Forrest France
|
|
|
Completed inspection for tenting at the east wing. Noted three areas in need of adjustment- notified general contractor. Also discussed FDC location to comply with IFC section 912 conditions.
|
INSP-Sprinkler Rough-in | 7/12/2012 | 7/12/2012 | 7/12/2012 | P | NH |
Forrest France
|
|
|
Arrived at the jobsite at 4:30- Gate locked, no access
|
INSP-Sprinkler Rough-in | 7/2/2012 | 7/2/2012 | 7/2/2012 | P | PART |
Forrest France
|
|
|
Tenting at the wet system lines west wing only approved as noted.
|
INSP-Sprinkler Rough-in | 6/19/2012 | 6/19/2012 | 6/20/2012 | A | PART |
Forrest France
|
|
|
Regarding exceptions allowed for non-sprinklered concealed spaces.
|
INSP-Sprinkler Rough-in | 6/15/2012 | 6/15/2012 | 6/15/2012 | P | PART |
Forrest France
|
|
|
East wing dry and wet system rough-in inspection as annotated and dated on stamped plans okayed. One seismic brace at the 3" dry main needs relocated per plan.
|
INSP-Sprinkler Rough-in/Hydro | 6/4/2012 | 6/5/2012 | 6/5/2012 | A | PART |
Forrest France
|
|
|
Overhead rough-in inspection for the west wing dry system completed. Need to verify insulation fill at two areas per plan for allowable exceptions, inspectors test connection and the last attic head east end are not yet installed. Ref. plans for dated annotations.
|
INSP-Sprinkler Rough-in | 6/4/2012 | 6/4/2012 | 6/4/2012 | P | PART |
Forrest France
|
|
|
|
Plan assigned to (Tim) | 5/15/2012 | | 5/16/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/16/2012 | | 5/16/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 5/16/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 5/16/2012 | | 5/16/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 5/16/2012 | | |
|
|
|
|
Telephone call | | | 5/16/2012 | | |
|
|
|
5-16-12 called Treasure Valley Fire Protection ( Brad) permit ready and fee given ///dld
|
Issue and Print Permit | | | 5/16/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 5/15/2012 | | |
|
|
|
|
Case Summary | | | 5/15/2012 | | |
|
|
|
|