INSP-Final Inspection | 7/2/2012 | 7/3/2012 | 7/3/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final walkthrough. One missing escutcheon installed while on site.
|
INSP-Sprinkler Rough-in | 5/30/2012 | 5/30/2012 | 5/30/2012 | P | PART |
Forrest France
|
|
|
Overhead work at the remodel area is approved for cover.
|
Application received | | | 5/22/2012 | | |
|
|
|
|
Plan assigned to (Tim) | 5/22/2012 | | 5/22/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/22/2012 | | 5/22/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 5/22/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 5/22/2012 | | 5/22/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 5/22/2012 | | |
|
|
|
|
Telephone call | | | 5/22/2012 | | |
|
|
|
5-22-12 called(Don) at Curtis Fire permit ready and fee given ///dld
|
Issue and Print Permit | | | 5/22/2012 | | DONE |
|
|
|
|