Miscellaneous action | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 9/12/2012 | 9/12/2012 | 9/12/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/10/2012 | 9/11/2012 | 9/12/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide pressure relief valve. Forward flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/22/2012 | 8/22/2012 | 8/22/2012 | P | PASS |
Troy Cobbley
|
|
|
wet system hydro passed
|
INSP-Sprinkler Rough-in/Hydro | 8/21/2012 | 8/21/2012 | 8/21/2012 | P | FAIL |
Troy Cobbley
|
|
|
The wet system hydro test failed due to visable pressure loss at the guage. Sprinkler coverage has been provided in the future kitchen area and pendant heads have been modified as discussed in the future restraunt restrooms.
|
INSP-Sprinkler Rough-in | 8/13/2012 | 8/13/2012 | 8/13/2012 | P | PASS |
Troy Cobbley
|
|
|
Overhead/hydrostatic test for both wet and dry systems passed.
|
Issue and Print Permit | | | 8/9/2012 | | DONE |
|
|
|
|
Miscellaneous action | | | 8/8/2012 | | DONE |
|
|
|
Field inspector during conference found fp piping installed before the permit was issued. Therefore, a double fee will apply.
Field inspector informed owner that the racking that was installed would required a racking permit since it is > 8' high. Field inspector also informed owner to remove all commodity from racks until an OC has been issured.
|
Sprinkler Plan Check | 6/6/2012 | | 6/6/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/6/2012 | | 6/6/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 6/6/2012 | | |
|
|
|
|
Telephone call | | | 6/6/2012 | | |
|
|
|
6-6-12 called (Don) Curtis Fire Sprinkler permit ready and fee given ///dld
|
Plan assigned to (Tim) | 5/25/2012 | | 6/6/2012 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 6/5/2012 | | |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/31/2012 | | DONE |
Tisha Gallop
|
|
|
Curtis Fire picked up denied plans
|
Sprinkler Plan Check | 5/30/2012 | | 5/30/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 5/30/2012 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/30/2012 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 5/30/2012 | | |
|
|
|
5-30-12 called (Don) Curtis Fire Sprinkler permit ready for pick up///dld
|
Plan resubmittals received | | | 5/29/2012 | | DONE |
Christina Prado
|
|
|
Received three new sets of plans marked FP-1. Gave to Tim for further review
|
Application received | | | 5/25/2012 | | |
|
|
|
|