Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR12-00274
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3415 N COLE RD
Project NameHobby Town
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of changing all pendent sprinklers to quick response. A couple of new small branch lines are being added in the western portion of the drawing. Most of the sprinklers are being relocated to accommodate new wall and ceiling configuration. Three existing tenant spaces are being combined into one space. The existing system is designed as three small trees. A new occupancy permit is required.

FIELD INSPECTOR: The building department scope of work does not correlate with the scope of work indicated on the fire protection plans. Therefore, please, do not approve the certificate of occupancy until the entire sprinkler system within the building department scope of work has been inspected and approved. You may of course approve the fire permit for the scope of work shown on the fire protection drawings if it is acceptable.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  10/11/2012 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection8/3/20128/3/20128/3/2012PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in7/10/20127/10/20127/10/2012PPASS
DetailsTroy Cobbley
Sprinkler piping can be covered.
INSP-Conference7/9/20127/10/20127/10/2012ADONE
DetailsTroy Cobbley
Sprinkler piping is ok to cover.
INSP-Conference7/9/20127/9/20127/9/2012PDONE
DetailsTroy Cobbley
Ceiling is ok to install from the west wall to the first column line.
INSP-Final Inspection7/9/20127/9/20127/9/2012PFAIL
DetailsTroy Cobbley
Inspection was actually a conference on what is required to fix the insulation blocking the upright sprinkler heads. We went over the NFPA 13 obstruction charts.
INSP-Sprinkler Rough-in7/3/20127/5/20127/5/2012APART
DetailsTroy Cobbley
Upright coverage has been added but the insulation blockage issue has not been addressed yet. Piping can not be covered yet.
INSP-Sprinkler Rough-in6/27/20126/28/20126/28/2012APART
DetailsTroy Cobbley
Rough-in, for pendant sprinklers, for the most part is ok. Almost all of the upright sprinklers are blocked by hanging insulation. Also Mike and I found one location where upright heads are overspaced from an existing wall and some of the existing upright heads are blocked by duct work. These two items will need to be addressed prior to an approval for cover being given.
Issue and Print Permit  6/11/2012 DONE
Plan assigned to (Tim)5/30/2012 6/5/2012 DONE
DetailsTim Frost
Sprinkler Plan Check6/5/2012 6/5/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  6/5/2012 DONE
DetailsTim Frost
Inspection Record Card- Fire6/5/2012 6/5/2012 DONE
DetailsDarla L Downs
Permit Ready to Issue  6/5/2012  
Telephone call  6/5/2012  
6-5-12 called (Tom) Shilo Automatic Sprinkler permit ready and fee given ///dld
Plan resubmittals received  6/1/2012 DONE
DetailsChristina Prado
received three sets of response letter, application, checklist, specs and plans marked FP-1. Routed to Tim Frost for further review
Sprinkler Plan Check5/31/2012 5/31/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  5/31/2012 FAIL
DetailsTim Frost
Telephone call  5/31/2012  
5-31-12 called Shilo Automatic Sprinkler let message for Tom permit ready for pick up///dld
Application received  5/30/2012