Permit Information
Permit NumberFIR12-00285
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 546 N MILWAUKEE ST
Project NameShell Work - No Tenant
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of adding, relocating and deleting sprinklers to provide shell protection until a new tenant occupies the space. The existing system is a 3”x2½”x1½” grid.

FIELD INSPECTOR: All sprinklers to be the same temperature and same response type.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  10/11/2012 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection8/27/20128/27/20128/27/2012PPASS
DetailsTroy Cobbley
Permit finaled. The hydro test and head change out will be addressed under the tenant permit.
Miscellaneous action  6/29/2012 DONE
Confirming Email
You and I spoke this morning regarding Dave & Buster’s Shell, Boise Towne Plaza, BLD12-01039 & FIR12-00285; and the upcoming Dave & Buster’s Tenant Improvement (D&B TI) to be constructed within this Shell space. We proposed and you agreed that two requirements:1- hydrostatic testing of the existing piping (drops were removed and plugged or sprigged-up to temporary shell upright sprinklers), and 2- the change out of mixed temperature sprinklers, could be performed during and after the new D&B TI are completed. This delay of the two items is contingent upon Treasure Valley Fire Protection (TVFP) being contracted to perform the tenant work within a timely schedule. Should TVFP not be awarded the Dave & Buster’s T.I. work, or should the T.I. work be delayed or canceled, TVFP has agreed to return and complete these two items, prior to any other contractor working on the system.



This afternoon we again spoke and you confirmed that your research has lead you to the conclusion that the new Arcade occupancy/hazard classification falls somewhere between Light Hazard (club, office, restaurant seating area) and Ordinary Group 2 Hazard (mercantile); therefore you will review working plans utilizing Ordinary Hazard Group 1 requirements.

INSP-Sprinkler Rough-in6/22/20126/22/20126/22/2012PPASS
DetailsTroy Cobbley
Rough-in passed. Piping placement, on the plans, does not necessarily match the actual installation. Piping needs to be hydro tested. Also per the plans the temp. and responce needs to match on all heads which it does not. There are 165 heads installed at the south/front of the project. The rest of the heads are 200 degree.
Plan assigned to (Tim)6/5/2012 6/7/2012 DONE
DetailsTim Frost
Sprinkler Plan Check6/7/2012 6/7/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  6/7/2012 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/7/2012 DONE
DetailsTim Frost
Inspection Record Card- Fire6/7/2012 6/7/2012 DONE
DetailsDarla L Downs
Permit Ready to Issue  6/7/2012  
Telephone call  6/7/2012  
6-7-12 called (Brodie)Treasure Valley Fire ///dld
Issue and Print Permit  6/7/2012 DONE
Application received  6/5/2012  
Pending Assignment by SAM6/5/2012 6/5/2012 DONE
DetailsAlexandra L. DeYoung