Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 6/27/2013 | 6/28/2013 | 6/28/2013 | A | PASS |
Troy Cobbley
|
|
|
underground flush & forward flowtest passed. Permit finaled
|
INSP-Sprinkler Rough-in | 6/12/2013 | 6/12/2013 | 6/12/2013 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 6/12/2013 | 6/12/2013 | 6/12/2013 | A | PASS |
Troy Cobbley
|
|
|
The remaining underground supply piping can be covered.
|
INSP-Final Inspection | 5/30/2013 | 6/4/2013 | 6/4/2013 | A | FAIL |
Troy Cobbley
|
|
|
Need to perform the forward flush and perform a depth, flush and hydro inspection on the underground supply as per discussion. Also need to verify the flow switch function/interconnection with the facp.
|
FIR-Aging Inspection | 2/7/2013 | 2/7/2013 | 2/13/2013 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
INSP-Sprinkler Rough-in/Hydro | 9/18/2012 | 9/18/2012 | 9/18/2012 | P | PASS |
Troy Cobbley
|
|
|
Overhead rough-in and hydro test passed. Contractor to provide hydraulic calculations showing the six additional 2" elbows.
|
INSP-Final Inspection | 9/17/2012 | 9/18/2012 | 9/18/2012 | A | CANC |
Troy Cobbley
|
|
|
Please call Jeff Stom with time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
|
Plan assigned to (Tim) | 6/5/2012 | | 6/7/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/7/2012 | | 6/7/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/7/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/7/2012 | | 6/7/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 6/7/2012 | | |
|
|
|
|
Telephone call | | | 6/7/2012 | | |
|
|
|
6-7-12 called (Jeff) Treasure Valley Fire permit ready and fee given ///dld
|
Issue and Print Permit | | | 6/7/2012 | | DONE |
|
|
|
|
Application received | | | 6/5/2012 | | |
|
|
|
|
Pending Assignment by SAM | 6/5/2012 | | 6/5/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|