Plan assigned to (Tim) | 8/22/2013 | | 8/22/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/22/2013 | | 8/22/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2013 | | DONE |
Tim Frost
|
|
|
|
DOC - Permit Finaled | | | 8/22/2013 | | DONE |
|
|
|
|
Miscellaneous action | | | 7/17/2013 | | PASS |
|
|
|
Contractor submitted revised sesmic calculations for 4" pipe. The distance apart is ok for 40' for laterals.
|
Plan assigned to (Tim) | 10/31/2012 | | 4/12/2013 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 11/12/2012 | 11/13/2012 | 11/13/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Earthquake bracing has been installed. I noted two missing retaining straps that Scott with Phoenix is going to install.
|
INSP-Final Inspection | 11/6/2012 | 11/7/2012 | 11/8/2012 | P | FAIL |
Forrest France
|
|
|
Missing seismic braces per plan at the new 3" main 1st floor. Remainder of ceiling tile and escutcheons yet to be installed at the second floor.
|
Miscellaneous action | | | 11/5/2012 | | DONE |
Tisha Gallop
|
|
|
contractor picked up as-builts
|
CHANGE STATUS TO (ISS) | | | 11/2/2012 | | DONE |
|
|
|
change to issue status per Tim Frost.
|
Telephone call | | | 11/2/2012 | | DONE |
Tisha Gallop
|
|
|
called Phoenix Fire Prot and left voicemail in general mailbox need to come pick up as-builts, no fees due.
|
Plan resubmittals received | | | 10/31/2012 | | DONE |
Tisha Gallop
|
|
|
PLAN MODIFICATION: received three copies of application submittal documents and plans; routed to Tim Frost
|
INSP-Sprinkler Rough-in | 10/29/2012 | 10/30/2012 | 10/30/2012 | A | FAIL |
Forrest France
|
|
|
Extended coverage SW head at the stairway landing is blocked by a beam, need access to view new main piping and tie-ins above the existing ceiling 1st floor, installation must match plan or provide new calcs per review notes- noted additional 90's at every drop and one extra 2 1/2" 90 2nd floor.
|
Plan assigned to (Tim) | 6/6/2012 | | 6/11/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/11/2012 | | 6/11/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/11/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/11/2012 | | 6/11/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 6/11/2012 | | |
|
|
|
|
Telephone call | | | 6/11/2012 | | |
|
|
|
6-11-12 called (Don) Phoenix Fire Protection permit ready and fee given ///dld
|
Issue and Print Permit | | | 6/11/2012 | | DONE |
|
|
|
|
Application received | | | 6/6/2012 | | |
|
|
|
|