Permit Information
Permit NumberFIR12-00314
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6752 S BUSINESS WAY
Project NameFEDEX
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of a new dry system and an extension to the existing wet system. The new dry system will protect a new extension to the existing building in the SE corner. The new dry system is design as a doubletree type layout with 6” mains, 1½” lines and 2” riser nipples. The dry system is design for ordinary hazard group II and has been calculated with 120 ft2 & 110 ft2 spacing with SSU large orifice sprinklers. Therefore there shall be no storage > 12’. The new wet system extension protects a small-office expansion in the NE corner of the office area.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  4/8/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection10/19/201210/22/201210/22/2012PPASS
DetailsForrest France
Scope of work finished. Fire sprinkler permit finaled.
INSP-Final Inspection10/19/201210/22/201210/22/2012APASS
DetailsForrest France
QOD on the dry system installed, trip testing passed. Fire sprinkler permit final approved.
INSP-Final Inspection10/18/201210/19/201210/22/2012AFAIL
DetailsForrest France
Dry system failed trip testing.
INSP-Sprinkler Rough-in/Hydro10/5/201210/5/201210/5/2012PPASS
DetailsTroy Cobbley
24 horu test passed.
INSP-Sprinkler Rough-in/Hydro10/3/201210/4/201210/4/2012APART
DetailsForrest France
Begin 24 hr. air test @ 11:30 AM at 42 psig.
INSP-Sprinkler Rough-in/Hydro10/3/201210/3/201210/3/2012PPART
DetailsForrest France
OH hydrostatic test of the new dry system passed.
INSP-Sprinkler Rough-in/Hydro9/28/20129/28/20129/28/2012PFAIL
DetailsForrest France
Overhead dry system hydrostatic test failed due to pressure loss at the guage.
INSP-Sprinkler Rough-in8/15/20128/16/20128/16/2012APART
DetailsForrest France
Overhead work at the new restrooms okay for cover- see dated plan annotations.
INSP-Final Inspection7/12/20127/16/20127/16/2012PPART
DetailsForrest France
This is a partial final, just checking the office part. Richard is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
Meeting  7/9/2012 DONE
DetailsRita DeYoung
per Tim Frost customer was charged for incorrect head count. Head count was changed from 215 to 127. See refund request.
INSP-Sprinkler Rough-in7/6/20127/6/20127/6/2012APART
DetailsForrest France
Overhead fire sprinkler rough-in at the additional office area okayed.
INSP-Sprinkler Rough-in7/3/20127/3/20127/6/2012PPART
DetailsForrest France
Modifications to the underground supply line included in the scope of work are approved for bury.
Issue and Print Permit  6/27/2012  
Plan assigned to (Tim)6/14/2012 6/26/2012 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/26/2012 DONE
Sprinkler Plan Check6/26/2012 6/26/2012 PASS
DetailsTim Frost
Inspection Record Card- Fire6/26/2012 6/26/2012 DONE
DetailsDarla L Downs
Inspection Record Card- Fire6/26/2012 6/26/2012 DONE
DetailsDarla L Downs
Permit Ready to Issue  6/26/2012  
Telephone call  6/26/2012  
6-26-12 called Tom- Shilo Automatic Sprinkler permit ready and fee given ///dld
Sprinkler Plan Check6/18/2012 6/18/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  6/18/2012 FAIL
DetailsTim Frost
Telephone call  6/18/2012  
6-18-12 called Tom permit ready for pick up ///dld
Application received  6/14/2012