Miscellaneous action | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 6/27/2012 | 6/28/2012 | 6/28/2012 | A | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work passed both rough-in and final inspections. Contractor to seal opening at the DP in the cooler as discussed.
|
Issue and Print Permit | | | 6/25/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 6/18/2012 | | 6/21/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/21/2012 | | 6/21/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/21/2012 | | 6/21/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 6/21/2012 | | |
|
|
|
|
Telephone call | | | 6/21/2012 | | |
|
|
|
6-21-12 called (Jeff P) Treasure Valley Fire permit ready and fee given ///dld
|
Sprinkler Plan Check | 6/19/2012 | | 6/19/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/19/2012 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/19/2012 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 6/19/2012 | | |
|
|
|
6-19-12 called (Jeff)Treasure Valley Fire permit ready for pick up///dld
|
Application received | | | 6/18/2012 | | |
|
|
|
|