INSP-Final Inspection | 7/27/2012 | 7/27/2012 | 7/31/2012 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Final Inspection | 7/26/2012 | 7/26/2012 | 7/27/2012 | P | NR |
Forrest France
|
|
|
call 30 minutes prior to arrival. Please cancel this inspection if the alarms have not been called in for the same time. Phone #: ###-#### >> Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 7/24/2012 | 7/25/2012 | 7/25/2012 | P | NR |
Forrest France
|
|
|
|
INSP-Final Inspection | 7/17/2012 | 7/18/2012 | 7/18/2012 | A | PART |
Forrest France
|
|
|
Inspection for cover at the drop ceilings and remainder of the scope of work completed. Final pending field ceiling tile and escutcheons.
|
INSP-Sprinkler Rough-in | 7/6/2012 | 7/9/2012 | 7/9/2012 | P | PART |
Forrest France
|
|
|
Fire sprinkler work above the new sheetrock ceilings at the service area, restrooms, vestibules, and dining area soffit are approved for cover. Noted three upright heads yet to be relocated per plan, heads in the cooler and drop ceilings are not ready. Discussed offsite monitoring for the fire sprinkler system.
|
Issue and Print Permit | | | 7/2/2012 | | DONE |
|
|
|
|
Application received | | | 6/28/2012 | | |
|
|
|
|
Plan assigned to (Tim) | 6/28/2012 | | 6/28/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/28/2012 | | 6/28/2012 | | PASS |
Tim Frost
|
|
|
|
1st review completed | | | 6/28/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/28/2012 | | 6/28/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 6/28/2012 | | |
|
|
|
|
Telephone call | | | 6/28/2012 | | |
|
|
|
6-28-12 called Absolute Fire left message for Sam permit ready and fee given ///dld
|