Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 10/16/2012 | 10/17/2012 | 10/16/2012 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit final approved.
|
INSP-Supply line flush | 8/13/2012 | 8/14/2012 | 8/14/2012 | A | PART |
Forrest France
|
|
|
Underground fire supply line flush completed acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro passed with 216 psi on the guage.
|
Fees Due Hold | 7/3/2012 | | 7/19/2012 | | DONE |
Christina Prado
|
|
|
|
INSP-Sprinkler Rough-in | 7/2/2012 | 7/3/2012 | 7/6/2012 | P | PART |
Forrest France
|
|
|
Underground fire supply line including the IBR is approved for bury.
|
Plan assigned to (Tim) | 6/28/2012 | | 7/2/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/2/2012 | | 7/2/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/2/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/2/2012 | | 7/2/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 7/2/2012 | | |
|
|
|
|
Issue and Print Permit | | | 7/2/2012 | | DONE |
|
|
|
|
Application received | | | 6/28/2012 | | |
|
|
|
|