Miscellaneous action | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2012 | 7/24/2012 | 7/24/2012 | P | PASS |
Troy Cobbley
|
|
|
Hydro test passed for the overhead systems.
|
INSP-Sprinkler Rough-in | 7/23/2012 | 7/24/2012 | 7/24/2012 | A | PASS |
Troy Cobbley
|
|
|
Tenting is passed. Sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 7/19/2012 | 7/20/2012 | 7/20/2012 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in passed. One pendant head still needed to be installed. One pendant head shown to be installed in the main level restroom has not been installed and doesn't need to be based on NFPA 13R 6.6.2. Piping can not be covered until the insulation/tenting is completed and inspected. An additional inspection will be required for this.
|
Issue and Print Permit | | | 7/12/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 6/28/2012 | | 7/9/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/9/2012 | | 7/9/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/9/2012 | | 7/9/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 7/9/2012 | | |
|
|
|
|
Telephone call | | | 7/9/2012 | | |
|
|
|
7-9-12 called Treasure Valley Fire -permit ready and fee given ///dld
|
Plan resubmittals received | | | 7/6/2012 | | |
|
|
|
Plan Mod*** received three new sets of applications; checklists; calcs and plans. Gave to TIm Frost for further review
|
1st review completed | | | 7/5/2012 | | FAIL |
|
|
|
|
Sprinkler Plan Check | 7/5/2012 | | 7/5/2012 | | FAIL |
Tim Frost
|
|
|
|
Telephone call | | | 7/5/2012 | | |
|
|
|
7-5-12 called Treasure Valley Fire permit ready ///dld
|
Miscellaneous action | | | 7/5/2012 | | DONE |
Tisha Gallop
|
|
|
TVFP picked up denied plans
|
Application received | | | 6/28/2012 | | |
|
|
|
|