INSP-Final Inspection | 9/12/2012 | 9/13/2012 | 9/13/2012 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 8/8/2012 | 8/9/2012 | 8/9/2012 | A | PART |
Forrest France
|
|
|
Overhead modifications at the remodel area grid ceilings are approved for cover.
|
Issue and Print Permit | | | 7/12/2012 | | DONE |
|
|
|
|
Application received | | | 7/11/2012 | | |
|
|
|
|
Plan assigned to (Tim) | 7/11/2012 | | 7/11/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/11/2012 | | 7/11/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/11/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/11/2012 | | 7/11/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 7/11/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/11/2012 | | DONE |
Tisha Gallop
|
|
|
called tvfp and told recep. that permit is ready and fees.
|