Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 1/31/2013 | 1/31/2013 | 1/31/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Plan assigned to (Tim) | 1/29/2013 | | 1/31/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/31/2013 | | 1/31/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/31/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/31/2013 | | 1/31/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 1/31/2013 | | DONE |
Tisha Gallop
|
|
|
called Phoenix Fire and left mssg for Don plan mod ready and fee due.
|
CHANGE STATUS TO (ISS) | | | 1/31/2013 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/30/2013 | | 1/30/2013 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 1/30/2013 | | FAIL |
Tim Frost
|
|
|
|
Telephone call | | | 1/30/2013 | | DONE |
Barbara Stitt
|
|
|
Called and left message for Don that plans failed and need picked up and re-submitted on 1-30-13 @ 8:55am
|
Miscellaneous action | | | 1/30/2013 | | DONE |
Tisha Gallop
|
|
|
contractor picked up denied plans
|
Plan resubmittals received | | | 1/30/2013 | | DONE |
Christina Prado
|
|
|
received three sets of apps, plans, submittal checklist and related submittal documents; routed to Tim Frost for review
|
Plan resubmittals received | | | 1/29/2013 | | |
|
|
|
Plan modification
|
INSP-Sprinkler Rough-in/Hydro | 1/25/2013 | 1/25/2013 | 1/25/2013 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed
|
INSP-Sprinkler Rough-in | 12/12/2012 | 12/12/2012 | 12/12/2012 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where piping can be covered. I posted a stop work order on the front of the building due to hardlids continuing to be installed prior to a sprinkler rough-in inspection. I had a previous conversation with contractor about this. Stop work order states "Stop all sheet rock that is covering sprinkler piping. Cover inspection is required".
|
INSP-Supply line flush | 11/14/2012 | 11/14/2012 | 11/14/2012 | P | PASS |
Troy Cobbley
|
|
|
The underground supply line flush passed.
|
INSP-Sprinkler Rough-in | 11/13/2012 | 11/14/2012 | 11/14/2012 | A | PASS |
Troy Cobbley
|
|
|
The entry lobby sprinkler piping is ok to re-cover. Tim Frost approved as-builts have been marked up by me for location and have been left on the job site with the sprinkler fitter.
|
INSP-Sprinkler Rough-in | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Perly Daniel
|
INSP-Sprinkler Rough-in | 11/7/2012 | 11/7/2012 | 11/7/2012 | P | FAIL |
Troy Cobbley
|
|
|
Joe Snyder was requesting a rough-in inspection for the main lobby entry area. I could not give approval due to the piping arrangement not matching the approved plans. The BB heads have been removed and standard coverage upright heads installed. Also the piping has been covered by sheet rock without approval. I spoke to the job site superintendant about a possible stop work order if covering pipe prior to an inspection continued. He agreed that it would not happen again. Plans need to be resubmitted showing the piping changes in all areas and access provided for the following inspection.
|
INSP-Sprinkler Rough-in | 10/17/2012 | 10/17/2012 | 10/17/2012 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the drive thru canopy can be covered.
|
INSP-Sprinkler Rough-in | 9/19/2012 | 9/20/2012 | 9/20/2012 | P | CANC |
Troy Cobbley
|
|
|
Underground Rough-in. Scott Carter is the contact at ###-####. Phone #: ###-#### >> Inspection requested via web by Kindel de Leon Inspection cancelled from web by: Kindel de Leon
|
Plan assigned to (Tim) | 7/12/2012 | | 9/17/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/17/2012 | | 9/17/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/17/2012 | | 9/17/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 9/17/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/17/2012 | | DONE |
Tisha Gallop
|
|
|
Called Phoenix Fire Protection and told recep. permit is ready and fees.
|
Issue and Print Permit | | | 9/17/2012 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/14/2012 | | DONE |
Christina Prado
|
|
|
Received three sets of plans, submital documents and applications:routed to Tim for further review
|
Sprinkler Plan Check | 8/21/2012 | | 8/21/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Telephone call | | | 8/21/2012 | | DONE |
Christina Prado
|
|
|
Called Phoenix fire to pick up
|
Plan resubmittals received | | | 8/20/2012 | | |
|
|
|
|
Sprinkler Plan Check | 8/6/2012 | | 8/6/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Telephone call | | | 8/6/2012 | | |
|
|
|
8-6-12 called Phoenix Fire to pick up///dld
|
Plan resubmittals received | | | 8/2/2012 | | DONE |
Tisha Gallop
|
|
|
received four copies of application, submittal documents and plans; routed to Fire review.
|
1st review completed | | | 7/17/2012 | | FAIL |
|
|
|
|
Sprinkler Plan Check | 7/17/2012 | | 7/17/2012 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/17/2012 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 7/17/2012 | | |
|
|
|
7-17-12 called Phoenix Fire permit ready to pick up ///dld
|
Application received | | | 7/12/2012 | | |
|
|
|
|
Pending Assignment by SAM | 7/12/2012 | | 7/12/2012 | | DONE |
Tisha Gallop
|
|
|
|