INSP-Final Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Sprinkler Rough-in | 1/6/2014 | 1/6/2014 | 1/6/2014 | A | PART |
Forrest France
|
|
|
Fire sprinkler work completed to date and as marked on approved plans okayed for cover.
|
INSP-Sprinkler Rough-in | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | PART |
Forrest France
|
|
|
Proposed changes to pipe routing and coverage at the short hall and adjacent two offices okayed pending accurate as-builts are provided at final.
|
INSP-Sprinkler Rough-in | 12/4/2013 | 12/4/2013 | 12/4/2013 | P | PART |
Forrest France
|
|
|
Okayed for cover fire sprinkler system modifications at the procedure room, exam room and hall as clouded and dated on approved plans.
|
INSP-Sprinkler Rough-in | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PART |
Forrest France
|
|
|
Rough-in at one exam room and the new work room okayed- note* Floorplan does not match provided permit documents, field modifications to branchline also noted.
|
FIR-Aging Inspection | 5/7/2013 | 5/7/2013 | 5/7/2013 | | DONE |
Forrest France
|
|
|
|
FIR-Aging Inspection | 1/31/2013 | 1/31/2013 | 2/1/2013 | | DONE |
Forrest France
|
|
|
In progress
|
FIR-Aging Inspection | 10/25/2012 | 10/25/2012 | 10/30/2012 | | DONE |
Forrest France
|
|
|
In progress
|
Issue and Print Permit | | | 7/16/2012 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/13/2012 | | 7/13/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/13/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/13/2012 | | 7/13/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 7/13/2012 | | |
|
|
|
|
Telephone call | | | 7/13/2012 | | |
|
|
|
called Brodie- Treasure Valley Fire permit ready and fee given ///dld
|
Application received | | | 7/12/2012 | | |
|
|
|
|
Pending Assignment by SAM | 7/12/2012 | | | | |
|
|
|
|