Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 10/15/2012 | 10/15/2012 | 10/16/2012 | P | PASS |
Forrest France
|
|
|
Overhead fire sprinkler work passed final inspection and walkthrough.
|
INSP-Sprinkler Rough-in/Hydro | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test of the wet and antifreeze systems passed.
|
INSP-Sprinkler Rough-in | 9/19/2012 | 9/19/2012 | 9/19/2012 | P | PART |
Forrest France
|
|
|
Overhead rough-in including the wet and antifreeze system is approved for cover. Noted two painted pendent heads in need of replacement, discussed construction rating of the riser room with the general contractor.
|
INSP-Sprinkler Rough-in | 8/21/2012 | 8/21/2012 | 8/21/2012 | P | PART |
Forrest France
|
|
|
Overhead work at the mens and womens restroom, yard service, and west entry vestibule/soffit are okay to cover. Locations marked and dated on plans.
|
Issue and Print Permit | | | 8/9/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 8/2/2012 | | 8/8/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/8/2012 | | 8/8/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/8/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 8/8/2012 | | 8/8/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 8/8/2012 | | |
|
|
|
|
Telephone call | | | 8/8/2012 | | |
|
|
|
8-8-12 called Treasure Valley Fire -permit ready and fee given ///dld
|
Case Summary | | | 8/2/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 8/2/2012 | | DONE |
Barbara Stitt
|
|
|
|