Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR12-00418
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 1449 S GOLDKING WAY
Project NameUnion Square Apartments Bld 8
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of protecting a new three floor apartment building per NFPA 13R. The system is supplied with floor level control valves, 1½” FDC and a 2” Backflow Preventer.

The underground is under permit FIR12-00247
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/23/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection3/20/20133/22/20133/22/2013APASS
DetailsTroy Cobbley
Permit finaled
FIR-Aging Inspection2/28/20132/28/20132/28/2013 NR
DetailsTroy Cobbley
Work is in progress
INSP-Sprinkler Rough-in11/8/201211/9/201211/9/2012APASS
DetailsTroy Cobbley
Third floor tenting has been corrected and the plans revised. Third floor piping can be covered.
Sprinkler Plan Check11/8/2012 11/8/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  11/8/2012 DONE
DetailsTim Frost
Telephone call  11/8/2012 DONE
DetailsChristina Prado
Called jonathan to advise permit is ready and gave fees due
Permit Ready to Issue  11/8/2012 DONE
DetailsChristina Prado
Inspection Record Card- Fire11/8/2012 11/8/2012 DONE
DetailsChristina Prado
(F) Reprint permit  11/8/2012 DONE
CHANGE STATUS TO (ISS)  11/8/2012 DONE
Plan assigned to (Tim)11/6/2012 11/8/2012 DONE
DetailsTim Frost
INSP-Sprinkler Rough-in11/7/201211/7/201211/7/2012PPASS
DetailsTroy Cobbley
The sprinkler piping on the first and second floors of this building can be covered. The third floor can not be covered due to piping and tenting issues. Potential problems exist on the first and second floors due to soffits. Contractor and I discussed the need for sprinkler spacing to meet NFPA 13R figure 6.4.6.3.4.3.
Plan resubmittals received  11/6/2012  
Plan modification
INSP-Sprinkler Rough-in11/1/201211/5/201211/5/2012AFAIL
DetailsTroy Cobbley
The first and second floor rough-in passed. There are some concerns that fixtures and possible soffits will be too close the the pendant heads. The third floor piping has alot of extra 90's in the piping including in the remote area. The pipe sizing does not match the plans either. I also noted that the tenting is not adequate in several areas. First and second floor piping only can be covered. Third floor piping needs to be resubmitted for review.
INSP-Sprinkler Rough-in/Hydro11/1/201211/5/201211/5/2012APASS
DetailsTroy Cobbley
Overhead hydro test passed.
Issue and Print Permit  10/8/2012 DONE
Plan assigned to (Tim)8/6/2012 8/29/2012 DONE
DetailsTim Frost
Sprinkler Plan Check8/29/2012 8/29/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  8/29/2012 DONE
DetailsTim Frost
Telephone call  8/29/2012 DONE
DetailsChristina Prado
Called JBL to advise permit is ready and gave fees due
Permit Ready to Issue  8/29/2012 DONE
DetailsChristina Prado
Inspection Record Card- Fire8/29/2012 8/29/2012 DONE
DetailsChristina Prado
Plan resubmittals received  8/24/2012  
Telephone call  8/10/2012 DONE
DetailsBarbara Stitt
Called and told plans were denied and need to pick up and re-submit on 8-9-12 @ 2:15pm//BAS
Sprinkler Plan Check8/9/2012 8/9/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  8/9/2012 FAIL
DetailsTim Frost
Miscellaneous action  8/9/2012 DONE
DetailsTim Frost
Emailed review to contractor
Application received  8/6/2012