INSP-Final Inspection | 4/11/2013 | 4/12/2013 | 4/12/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2013 | 3/13/2013 | 3/13/2013 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed
|
INSP-Sprinkler Rough-in | 12/11/2012 | 12/12/2012 | 12/12/2012 | A | PASS |
Troy Cobbley
|
|
|
The tenting has been repaired on the third floor. Piping can be covered.
|
INSP-Sprinkler Rough-in | 12/10/2012 | 12/11/2012 | 12/11/2012 | A | FAIL |
Troy Cobbley
|
|
|
Tenting has not been repaired/completed.
|
INSP-Sprinkler Rough-in | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PART |
Troy Cobbley
|
|
|
The first and second floors of sprinkler piping can be covered but the third floor piping can not be covered due to tenting not being adequate in several locations.
|
Sprinkler Plan Check | 12/7/2012 | | 12/7/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2012 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 12/7/2012 | | DONE |
Christina Prado
|
|
|
called jonathan to advise permit is ready and gave fees due
|
Inspection Record Card- Fire | 12/7/2012 | | 12/7/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 12/7/2012 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/7/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 12/7/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 12/5/2012 | | |
|
|
|
12-5-12 received 3 sets of plans,3 form 603 & 3 victaulic /product description/techanical specifications sent to Tim Frost
|
Issue and Print Permit | | | 11/5/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 8/6/2012 | | 8/29/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/29/2012 | | 8/29/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 8/29/2012 | | 8/29/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 8/29/2012 | | |
|
|
|
|
Telephone call | | | 8/29/2012 | | |
|
|
|
8-29-12 called JBL Fire left message permit ready and fee given ///dld
|
Plan resubmittals received | | | 8/24/2012 | | |
|
|
|
|
Sprinkler Plan Check | 8/10/2012 | | 8/10/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/10/2012 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/10/2012 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 8/10/2012 | | DONE |
Christina Prado
|
|
|
called JBL to advise denied plans need to be picked up
|
Application received | | | 8/6/2012 | | |
|
|
|
|
Pending Assignment by SAM | 8/6/2012 | | 8/6/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|