Permit Information
Permit NumberFIR12-00421
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 1411 S GOLDKING WAY
Project NameUnion Square Apartments Bld 7
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of protecting a new three floor apartment building per NFPA 13R. The system is supplied with floor level control valves, 1½” FDC and a 2” Backflow Preventer.

The underground is under permit FIR12-00247
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/23/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection6/3/20136/5/20136/5/2013APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro3/12/20133/13/20133/13/2013PPASS
DetailsTroy Cobbley
Overhead hydro passed
INSP-Sprinkler Rough-in1/22/20131/23/20131/23/2013APASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover. There are two vertical sections of pipe where the insulator "boxed in" an area to keep the pipe warm. This should work and the building owner and sprinkler contractor are aware of the implications if it should fail and that they are ultimately responcible for keeping the piping above 40 degrees.
INSP-Sprinkler Rough-in1/16/20131/22/20131/23/2013APASS
DetailsTroy Cobbley
Piping is ok to cover.
Plan assigned to (Tim)8/6/2012 12/18/2012 DONE
DetailsTim Frost
Sprinkler Plan Check12/18/2012 12/18/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  12/18/2012 DONE
DetailsTim Frost
Telephone call  12/18/2012 DONE
DetailsChristina Prado
Called Jonathan to advise permit is ready and gave fees due
Permit Ready to Issue  12/18/2012 DONE
DetailsChristina Prado
Inspection Record Card- Fire12/18/2012 12/18/2012 DONE
DetailsChristina Prado
Issue and Print Permit  12/18/2012 DONE
Plan resubmittals received  12/17/2012 DONE
DetailsChristina Prado
received three sets of applications, submittal documents and plans; routed to Tim for review
Plan resubmittals received  8/24/2012  
Plans that were recieved for this building were the wrong building need a new set of pland for correct building. Tim notified contractor on 8-29-12//BAS
Sprinkler Plan Check8/10/2012 8/10/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  8/10/2012 FAIL
DetailsTim Frost
Miscellaneous action  8/10/2012 DONE
DetailsTim Frost
Emailed review to contractor
Telephone call  8/10/2012 DONE
DetailsTisha Gallop
called Jonothan and left vm denied plans here for pick up.
Application received  8/6/2012