Miscellaneous action | | | 9/26/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Forrest France
|
|
|
Fire alarm permit final approved.
|
INSP-Sprinkler Rough-in/Hydro | 9/18/2012 | 9/19/2012 | 9/20/2012 | P | PASS |
Forrest France
|
|
|
C/N items finished. Re-inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/17/2012 | 9/18/2012 | 9/18/2012 | P | FAIL |
Forrest France
|
|
|
Missing SD above the new NAC panel, audible and visual notification devices are not in sync.
|
Issue and Print Permit | | | 8/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 8/8/2012 | | 8/22/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan assigned to (Stephanie) | 8/8/2012 | | 8/22/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Miscellaneous action | | | 8/22/2012 | | DONE |
|
|
|
requested battery calculations for the existing fire alarm panel since new initiating devices are being added.
|
Miscellaneous action | | | 8/22/2012 | | DONE |
|
|
|
Per the contractor, the pull station and smoke detector are existing, so there is no change to the fire alarm panel battery calculations.
|
1st review completed | | | 8/22/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 8/22/2012 | | 8/22/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/22/2012 | | DONE |
|
|
|
Approved redlined plans taken to permit technician for processing.
|
Inspection Record Card- Fire | 8/22/2012 | | 8/22/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 8/22/2012 | | |
|
|
|
|
Telephone call | | | 8/22/2012 | | |
|
|
|
8-22-12 called RME permit ready and fee given ///dld
|
Application received | | | 8/8/2012 | | |
|
|
|
|