INSP-Final Inspection | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/14/2015 | 12/16/2015 | 12/16/2015 | A | FAIL |
Troy Cobbley
|
|
|
Duct smoke detectors tested ok. FOr a final need as-builts submitted to lee for approval showing the different dialer and changed device counts and addresses. Also need to mount the map at the facp.
|
INSP-Conference | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | DONE |
Troy Cobbley
|
|
|
Danielle with the propertry management company and I discussed getting the FIR12-00433 finaled prior to a final sign off on BLD15-03739. With Scott Arellano's permission the tenant can receive a temporary occupancy for 30 days while the contractors work towards getting the FIR permit finaled.
|
Issue permit | | | 4/12/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Fees Due Hold | 4/5/2013 | | 4/12/2013 | | DONE |
|
|
|
|
INSP-Final Inspection | 4/2/2013 | 4/3/2013 | 4/3/2013 | A | FAIL |
Troy Cobbley
|
|
|
The first hvac unit tested did not shutdown upon activation of the duct smoke detector so no others were tested. The DSC communicator installed is not the model number in the submittal package and will need to be submitted for approval. As-builts and map do not match the actual installation with additional devices shown that have not been installed and addressing changes. The sprinkler systems devices did test ok and the correct signals were received at central station.
|
INSP-Alarm Testing | 3/21/2013 | 3/25/2013 | 3/25/2013 | P | NR |
Forrest France
|
|
|
|
INSP-Alarm Testing | 3/13/2013 | 3/15/2013 | 3/15/2013 | A | FAIL |
Troy Cobbley
|
|
|
The approved "plan modification" drawings are not provided, pull station is too high, batteries are too small, sample tubes are too short (per silent knight tech support), need as-builts showing the deleted devices, per conversation only one of the hvac unit shuts down immediately upon detection of smoke. No actual testing was performed.
|
FIR-Aging Inspection | 2/5/2013 | 2/5/2013 | 2/13/2013 | | NR |
Troy Cobbley
|
|
|
I left a voice mail for Anita at ESI requesting job status and then I spoke to Buster at RME and he stated that there is a monitoring problem that they are waiting for ESI to resolve. I will speak to Anita when she calls.
|
CHANGE STATUS TO (ISS) | | | 12/12/2012 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/12/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 12/3/2012 | | 12/11/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 12/11/2012 | | 12/11/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 12/11/2012 | | DONE |
|
|
|
Approved plan modification documents taken to the permit technician for processing.
|
Inspection Record Card- Fire | 12/11/2012 | | 12/11/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 12/11/2012 | | |
|
|
|
|
Telephone call | | | 12/11/2012 | | |
|
|
|
12-11-12 called r m e permit ready and fee given ///dld
|
Plan resubmittals received | | | 12/3/2012 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: received applicaiton and two copies of submittal folder and plans; routedt o SLC
|
Issue and Print Permit | | | 8/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/17/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/17/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 8/17/2012 | | 8/17/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Stephanie) | 8/8/2012 | | 8/16/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan assigned to (Stephanie) | 8/8/2012 | | 8/16/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 8/16/2012 | | DONE |
|
|
|
Spoke to Jeff Smith at E2CO to get clarification. I explained the permit indicates a new fire alarm panel to monitor a new sprinkler system in an existing building, however records indicate there is an existing sprinkler system. I asked him if they were actually replacing an existing fire alarm panel and he said he didn't know for sure that he would need to make some phone calls and get back to me.
|
Miscellaneous action | | | 8/16/2012 | | DONE |
|
|
|
Per a site visit by T. Cobbley, there is an existing Radionics fire alarm panel currently monitoring the sprinkler system in this space.
|
Telephone call | | | 8/16/2012 | | DONE |
|
|
|
Spoke with Jeff Smith with E2CO to let him know about the existing fire alarm control panel and ask if it is their intent to remove the existing panel or to network in to the existing panel. He stated it is the intent to remove the existing fire alarm panel and install a new fire alarm panel (indicated on the plans as being installed in Electrical Room 107).
|
1st review completed | | | 8/16/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 8/16/2012 | | 8/16/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/16/2012 | | DONE |
|
|
|
Approved plans taken to permit technicians for processing.
|
Application received | | | 8/8/2012 | | |
|
|
|
|