Miscellaneous action | | | 11/30/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Alarm Testing | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Forrest France
|
|
|
C/N items verified. Remainder of fire alarm testing completed satisfactory.
|
INSP-Final Inspection | 11/28/2012 | 11/28/2012 | 11/29/2012 | P | PART |
Forrest France
|
|
|
Completed initial walkthrough. Items noted include five non-functional HD to be removed, add visual coverage per plan review red-lines at the second floor corridor building A, provide coverage at the maintenance work room building C 1st floor, post a legible points map at the panel. Discussed remainder of test schedule.
|
Issue and Print Permit | | | 9/5/2012 | | DONE |
|
|
|
|
Alarm Plan Check | 9/4/2012 | | 9/4/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/4/2012 | | DONE |
|
|
|
Approved redlined plans taken to permit technician for processing.
|
Permit Ready to Issue | | | 9/4/2012 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Fire | 9/4/2012 | | 9/4/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/4/2012 | | DONE |
Tisha Gallop
|
|
|
called Tyler and left mssg permit is ready and fee.
|
Plan assigned to (Stephanie) | 8/9/2012 | | 9/4/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Plan resubmittals received | | | 8/28/2012 | | |
|
|
|
8-28-12 received 2 Fire applications and plans sent to Steph ///dld
|
Telephone call | | | 8/23/2012 | | DONE |
|
|
|
Ken Webster called to let me know the owners do intend on keeping the AES for monitoring. I let him know that since the AES information was not indicated on the plans, it would not be acceptable to field verify with as-builts. I let him know I would be willing to approve the plans with the understanding that a plan modification would be required and that includes additional review feels; or I could deny the plans and he could resubmit with that an other changes he and I had discussed and there would only be the review fee assessed once I approved the permit. He opted to have me deny the plans and he will resubmit.
|
1st review completed | | | 8/23/2012 | | FAIL |
|
|
|
|
Alarm Plan Check | 8/23/2012 | | 8/23/2012 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied - see review comments and redlines
|
Miscellaneous action | | | 8/23/2012 | | DONE |
|
|
|
Emailed the applicant to let him know the plans have been denied and also sent a courtesy email to Ken Webster letting him know the plans have been denied and he can pick them up at th permit counter.
|
Miscellaneous action | | | 8/23/2012 | | DONE |
|
|
|
Plans taken to permits and filed in the drawer under 'R' for Rocky Mountain Electric.
|
Telephone call | | | 8/22/2012 | | DONE |
|
|
|
Called Ken Webster regarding the existing AES panel. His plans indicate phone lines with a DACT so I asked for clarification. He said he would check in to it with the owner and let me know if they will be keeping the AES or going back to phone lines.
|
Application received | | | 8/9/2012 | | |
|
|
|
|
Case Summary | | | 8/9/2012 | | DONE |
Barbara Stitt
|
|
|
|