Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 1/8/2013 | 1/8/2013 | 1/8/2013 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit work approved for final.
|
INSP-Sprinkler Rough-in | 10/31/2012 | 11/1/2012 | 11/1/2012 | A | PASS |
Troy Cobbley
|
|
|
underground flush passed inspection
|
INSP-Supply line flush | 10/29/2012 | 10/29/2012 | 10/29/2012 | P | NR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 9/6/2012 | 9/7/2012 | 9/7/2012 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok to cover. Two additional elbows have been installed. The designer is to incorporate this into the overhead sprinkler system design.
|
Plan assigned to (Tim) | 8/13/2012 | | 8/16/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/16/2012 | | 8/16/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/16/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2012 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 8/16/2012 | | DONE |
Christina Prado
|
|
|
Called Jon to advise permit is ready
|
Inspection Record Card- Fire | 8/16/2012 | | 8/16/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/16/2012 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 8/16/2012 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary | | | 8/13/2012 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 8/13/2012 | | |
|
|
|
|