Miscellaneous action | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 9/19/2012 | 9/20/2012 | 9/20/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 9/6/2012 | 9/10/2012 | 9/10/2012 | A | PASS |
Troy Cobbley
|
|
|
Overhead cover inspection passed. Sprinkler piping can be covered.
|
Issue and Print Permit | | | 8/22/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 8/20/2012 | | 8/21/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/21/2012 | | 8/21/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/21/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2012 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 8/21/2012 | | DONE |
Christina Prado
|
|
|
called Jeff to give fees due and advise permit is ready
|
Inspection Record Card- Fire | 8/21/2012 | | 8/21/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/21/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 8/20/2012 | | |
|
|
|
|
Case Summary | | | 8/20/2012 | | DONE |
|
|
|
|