Miscellaneous action | | | 9/26/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 9/7/2012 | 9/7/2012 | 9/10/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/6/2012 | 9/7/2012 | 9/7/2012 | A | PASS |
Troy Cobbley
|
|
|
Inspection passed. There was an existing AES panel installed by Alarmco. The technician called Mark S. with Alarmco and I spoke to him directly to get a verbal confirmation that the NETCON rating was at a 5. He also will be emailing me a scanned PDF of the written verification.
|
INSP-Final Inspection | 8/30/2012 | 8/31/2012 | 8/31/2012 | A | FAIL |
Stephanie L. Cobbley
|
|
|
Weatherproof devices were not installed (per redlines on plans) in the shower rooms.
|
Issue and Print Permit | | | 8/28/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 8/22/2012 | | 8/27/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 8/27/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 8/27/2012 | | 8/27/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Quick permit approved with redlines - there are no written review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/27/2012 | | DONE |
|
|
|
Quick permit redlined plans taken to permit technician for processing.
|
Permit Ready to Issue | | | 8/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Fire | 8/27/2012 | | 8/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/27/2012 | | DONE |
Tisha Gallop
|
|
|
called Jason and told him permit is ready, fees due.
|
Application received | | | 8/22/2012 | | |
|
|
|
|