Miscellaneous action | | | 11/30/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 9/26/2012 | 9/27/2012 | 9/27/2012 | P | PASS |
Forrest France
|
|
|
Fire alarm testing passed. Permit finaled.
|
Miscellaneous action | | | 9/18/2012 | | DONE |
|
|
|
Fire Sentry Systems brought in two sets of plans intending them to be a "plan modification". After looking through, I determined that it was not necessary to submit them and accepted them as as-built documents instead. I let the contractor know that I would keep one set for the City records, and to please have the other set available along with the job-site city approved plans at the time of final inspection.
|
Permit Ready to Issue | | | 9/6/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue and Print Permit | | | 9/6/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Stephanie) | 8/22/2012 | | 8/29/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Miscellaneous action | | | 8/29/2012 | | DONE |
|
|
|
2 sets of plans taken in per Stephanie Cobbley
|
1st review completed | | | 8/29/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 8/29/2012 | | 8/29/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/29/2012 | | DONE |
|
|
|
Approved redlined plans taken to permit technicians for processing.
|
Inspection Record Card- Fire | 8/29/2012 | | 8/29/2012 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 8/29/2012 | | |
|
|
|
8-29-12 called John - Fire Sentry Systems permit ready and fee given ///dld
|
Application received | | | 8/22/2012 | | |
|
|
|
|