Miscellaneous action | | | 4/8/2013 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 10/15/2012 | 10/15/2012 | 10/15/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/11/2012 | 10/12/2012 | 10/12/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire sprinkler system.
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2012 | 10/5/2012 | 10/5/2012 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed inspection.
|
INSP-Sprinkler Rough-in | 10/2/2012 | 10/3/2012 | 10/3/2012 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok for cover. The hydro test still needs to be performed and the annual inspection is due.
|
Issue and Print Permit | | | 9/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 9/4/2012 | | 9/7/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/7/2012 | | 9/7/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/7/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/7/2012 | | 9/7/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 9/7/2012 | | |
|
|
|
|
Telephone call | | | 9/7/2012 | | |
|
|
|
9-7-12 called Shilo Automatic Sprinkler permit ready and fee given ///dld
|
Application received | | | 9/4/2012 | | |
|
|
|
|