Miscellaneous action | | | 12/3/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 10/30/2012 | 10/31/2012 | 10/31/2012 | A | PASS |
Forrest France
|
|
|
On site inspection completed 10/30 by S. Cobbley passed. Fire alarm permit final approved.
|
INSP-Final Inspection | 10/29/2012 | 10/30/2012 | 10/30/2012 | A | DONE |
Forrest France
|
|
|
Access control doors functioned properly. I told Art to provide as-built drawings showing the actual locations of the push buttons. The pull station in the riser room did not function properly. I let Art know that I would contact Code Enforcement regarding the pull station, and it would not affect his permit.
|
Issue and Print Permit | | | 9/17/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 9/5/2012 | | 9/12/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 9/12/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 9/12/2012 | | 9/12/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/12/2012 | | DONE |
|
|
|
Approved plans taken to the permit technician for processing.
|
Inspection Record Card- Fire | 9/12/2012 | | 9/12/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 9/12/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/12/2012 | | DONE |
Tisha Gallop
|
|
|
called Dave and told him permit is ready and fees.
|
Case Summary | | | 9/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 9/5/2012 | | |
|
|
|
|