Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 6/27/2013 | 6/27/2013 | 6/28/2013 | | DONE |
Troy Cobbley
|
|
|
work is in progress
|
FIR-Aging Inspection | 2/19/2013 | 2/19/2013 | 2/20/2013 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2012 | 10/1/2012 | 10/1/2012 | A | CANC |
Troy Cobbley
|
|
|
Need an Underground Hydro inspection 1st thing in the morning if possible - Brian Dunham is the contact at 570.0497 Phone #: ###-#### >> Inspection requested via web by Kindel de Leon Inspection cancelled from web by: Scott Carter II
|
INSP-Sprinkler Rough-in | 9/26/2012 | 9/27/2012 | 9/27/2012 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok to cover. I noted that two additional (four total) 45 degree fittings have been installed and will need to be included in the hydraulic calculations for the overhead sprinkler system.
|
Miscellaneous action | | | 9/27/2012 | | DONE |
|
|
|
(4) 45 Ells instead of 2 as shown
|
Issue and Print Permit | | | 9/17/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/5/2012 | | 9/7/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/7/2012 | | 9/7/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/7/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/7/2012 | | 9/7/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 9/7/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/7/2012 | | DONE |
Tisha Gallop
|
|
|
called Phoenix Fire and left mssg with Nate that permit is ready and fee.
|
Application received | | | 9/5/2012 | | |
|
|
|
|